共 50 条
- [41] A revised method for calculating stress release ratio in tunnel excavation Yanshilixue Yu Gongcheng Xuebao, 11 (2251-2257):
- [42] Tunnel Strength and Excavation Effect under Different Stress Paths MECHANICAL ENGINEERING, MATERIALS SCIENCE AND CIVIL ENGINEERING II, 2014, 470 : 902 - 906
- [43] Numerical modeling for the stress displacement distribution of tunnel after excavation FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4827 - 4830
- [44] Characteristics of an excavation damaged zone developed around KAERI underground research tunnel ISRM Int. Symp. Rock Mech., SINOROCK, 1600,
- [47] The Excavation Damage Zone of a Subway Tunnel Considering Stress Release GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 174 - 181
- [48] Analytical evaluation of post-excavation hydraulic conductivity field around a tunnel International Journal of Rock Mechanics and Mining Sciences, 1997, 34 (3-4): : 1 - 181
- [49] Numerical simulation research on excavation face stability of different depths of shield tunnel Miao, Linchang (Lc.miao@seu.edu.cn), 1600, Southeast University (47): : 164 - 169
- [50] Diagrams analysis and application of construction face stability in tunnel and shaft excavation safety MINE HAZARDS PREVENTION AND CONTROL TECHNOLOGY, 2007, : 363 - 367