A DEA approach for comparing solution efficiency in U-line balancing problem using goal programming

被引:0
|
作者
机构
[1] Farkhondeh, Hami
[2] Hassanzadeh, Reza
[3] Mahdavi, Iraj
[4] Mahdavi-Amiri, Nezam
来源
Mahdavi, I. (irajarash@rediffmail.com) | 1600年 / Springer London卷 / 61期
关键词
Data envelopment analysis;
D O I
暂无
中图分类号
学科分类号
摘要
Conference article (CA)
引用
收藏
页码:9 / 12
相关论文
共 50 条
  • [31] TRADITIONAL AND FUZZY GOAL PROGRAMMING APPROACHES FOR RESOURCE DEPENDENT ASSEMBLY LINE BALANCING PROBLEM
    Atasagun, Yakup
    Doyen, Alper
    Atasagun, Gozde Can
    NUMERICAL ALGEBRA CONTROL AND OPTIMIZATION, 2024, 14 (01): : 214 - 226
  • [32] EFFICIENCY EVALUATION IN MULTI-STAGE DEA MODELS: A MINIMAX GOAL PROGRAMMING APPROACH
    Jablonsky, Josef
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE: QUANTITATIVE METHODS IN ECONOMICS: MULTIPLE CRITERIA DECISION MAKING XIX, 2018, : 144 - 150
  • [33] An effective hybrid goal programming approach for multi-objective straight assembly line balancing problem with stochastic parameters
    Heydar Ali Mardani-Fard
    Abdollah Hadi-Vencheh
    Ali Mahmoodirad
    Sadegh Niroomand
    Operational Research, 2020, 20 : 1939 - 1976
  • [34] An effective hybrid goal programming approach for multi-objective straight assembly line balancing problem with stochastic parameters
    Mardani-Fard, Heydar Ali
    Hadi-Vencheh, Abdollah
    Mahmoodirad, Ali
    Niroomand, Sadegh
    OPERATIONAL RESEARCH, 2020, 20 (04) : 1939 - 1976
  • [35] A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks
    Kazemi, Seyed Mahmood
    Ghodsi, Reza
    Rabbani, Masoud
    Tavakkoli-Moghaddam, Reza
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (9-12): : 1111 - 1122
  • [36] A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks
    Industrial Engineering Department, University of Tehran, Tehran, Iran
    Int J Adv Manuf Technol, 9-12 (1111-1122):
  • [37] A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks
    Seyed Mahmood Kazemi
    Reza Ghodsi
    Masoud Rabbani
    Reza Tavakkoli-Moghaddam
    The International Journal of Advanced Manufacturing Technology, 2011, 55 : 1111 - 1122
  • [38] Multi-Objective Assembly Line Balancing Problem with Setup Times Using Fuzzy Goal Programming and Genetic Algorithm
    Lee, Amy H. I.
    Kang, He-Yau
    Chen, Chong-Lin
    SYMMETRY-BASEL, 2021, 13 (02): : 1 - 28
  • [39] An interactive fuzzy programming approach for bi-objective straight and U-shaped assembly line balancing problem
    Alavidoost, M. H.
    Babazadeh, Hossein
    Sayyari, S. T.
    APPLIED SOFT COMPUTING, 2016, 40 : 221 - 235
  • [40] A dynamic programming approach to a multi-objective disassembly line balancing problem
    Yusha Zhou
    Xiuping Guo
    Dong Li
    Annals of Operations Research, 2022, 311 : 921 - 944