A sequencing algorithm for mixed-model assembly lines

被引:0
|
作者
Tokyo Metropolitan University [1 ]
机构
来源
J. Jpn Ind. Manage. Assoc. | 2007年 / 4卷 / 257-266期
关键词
Leveling of the workload - Mixed-model assembly line - Sequencing problem;
D O I
暂无
中图分类号
学科分类号
摘要
There exist many studies regarding sequencing problems in mixed-model assembly lines. The goal of many of these studies is to level the workload at each workstation on the assembly line in order to reduce the line stoppage time as much as possible. In the real mixed-model assembly lines of vehicles, the total workload of each vehicle is used to level the workload at each workstation. This is the same as the assembly lines having only one workstation. This is the reason why it is very difficult to maintain data on all the processing times of each workstation as listed in the following. (1) There exist many workstations in vehicle assembly lines. Moreover, the number of specifications for a vehicle is very large. (2) Continuous improvements for operations at workstations and assembly line balancing are always performed. As a result, we approach a sequencing problem for mixed-model assembly lines with only one workstation. There have been very few studies regarding this problem. Therefore, we have investigated it and obtained related characteristics. We propose an approximation algorithm using these properties. It is shown by numerical examples that the proposed algorithm can find a good sub-optimal solution.
引用
收藏
相关论文
共 50 条
  • [31] Mixed-model assembly line sequencing with hybrid genetic algorithm and simulation
    Dong, JH
    Xiao, TY
    Fan, SH
    Qiang, L
    SYSTEM SIMULATION AND SCIENTIFIC COMPUTING (SHANGHAI), VOLS I AND II, 2002, : 541 - 545
  • [32] JIT sequencing for mixed-model assembly lines with setups using Tabu search
    McMullen, PR
    PRODUCTION PLANNING & CONTROL, 1998, 9 (05) : 504 - 510
  • [33] Incorporating car-sequencing rules in the planning of mixed-model assembly lines
    Sikora, Celso Gustavo Stall
    Tiacci, Lorenzo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (06) : 2114 - 2132
  • [34] Scheduling Mixed-Model Assembly Lines with Cost Objectives by a Hybrid Algorithm
    Wang, Binggang
    Rao, Yunqing
    Shao, Xinyu
    Wang, Mengchang
    INTELLIGENT ROBOTICS AND APPLICATIONS, PT II, PROCEEDINGS, 2008, 5315 : 378 - 387
  • [35] Car Sequencing in Mixed-model Assembly Lines from the Perspective of Logistics Optimisation
    Liu, Wenping
    Han, Yuming
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 952 - 957
  • [36] Multi-Objective Optimization for Models Sequencing in Mixed-Model Assembly Lines
    Rauf, Mudassar
    Sarfraz, Shoaib
    Shehab, Essam
    Javeed, Saima
    Jahanzaib, Mirza
    ADVANCES IN MANUFACTURING TECHNOLOGY XXXI, 2017, 6 : 96 - 101
  • [37] Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
    Scholl, A
    Klein, R
    Domschke, W
    JOURNAL OF HEURISTICS, 1998, 4 (04) : 359 - 381
  • [38] Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry
    Jan Dörmer
    Hans-Otto Günther
    Rico Gujjula
    Flexible Services and Manufacturing Journal, 2015, 27 : 1 - 29
  • [39] JIT sequencing for mixed-model assembly lines with setups using Tabu Search
    McMullen, P.R.
    Production Planning and Control, 1998, 9 (05): : 504 - 510
  • [40] Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry
    Doermer, Jan
    Guenther, Hans-Otto
    Gujjula, Rico
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2015, 27 (01) : 1 - 29