Lake Tawakoni water supply project Construction management: Engineers as resident representatives

被引:0
|
作者
Bennett, David [1 ]
Meisner, Sam [1 ]
机构
[1] Freese and Nichols Inc., 1701 N. Market Street, Dallas, TX 75202, United States
关键词
Compilation and indexing terms; Copyright 2025 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
Drought - Project management - Reservoirs (water) - Sewers - Water pipelines - Water supply - Pipeline corrosion - Trenching - Construction equipment
引用
收藏
页码:610 / 620
相关论文
共 50 条
  • [41] Planning and project management of the world's largest privatized water supply system
    Martin, BW
    Leray, R
    Criado, C
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 61 - 66
  • [42] SUPPLY OF PHOSPHORUS TO THE WATER COLUMN OF A PRODUCTIVE HARDWATER LAKE - CONTROLLING MECHANISMS AND MANAGEMENT CONSIDERATIONS
    DRISCOLL, CT
    EFFLER, SW
    AUER, MT
    DOERR, SM
    PENN, MR
    HYDROBIOLOGIA, 1993, 253 (1-3) : 61 - 72
  • [43] Construction material supply risk management using Asian option contracts: the case of a pipeline project
    Vahdatmanesh, Mohammad
    Firouzi, Afshin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (10) : 3395 - 3414
  • [44] A multi-disciplinary representation of the supply chain information in construction: An innovative approach to project management
    Cutting-Decelle, Anne-Francoise
    Young, Robert
    Das, Bishnu
    Anumba, Chimay
    Bouchiaghern, Dino
    Baldwin, Andrew
    TOOLS AND METHODS OF COMPETITIVE ENGINEERING Vols 1 and 2, 2004, : 465 - 474
  • [45] Matched study on the current management situation of water supply by frequency conversion system and old two-time water supply system in resident regions
    Xia Qing-hua
    Tang Chuan-xi
    Xu Miao-zhen
    Wang Yi-wei
    Proceedings of the 4th International Academic Conference on Environmental and Occupational Medicine, 2007, : 124 - 124
  • [46] A Water Resources Management System as a tool to guarantee the water supply of an iron ore mining project in Brazil
    Alvim de Castro, Leonardo Mitre
    Centeno Cordeiro, Jose Roberto
    Pastana de Souza, Ana Katiuscia
    Cabral Oliveira, Gilcimar Pires
    MINE WATER & INNOVATIVE THINKING, 2010, : 35 - 38
  • [48] Study on Measurement Method for Flexible Management Effect of Project Schedule under Construction Supply Chain Mode
    Liu Bo
    Shen Ju-qin
    Tan Fei
    Wang Da-wei
    Tang Liang
    Yan Shi-feng
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 3366 - +
  • [49] An i'ntegrated construction supply chain management model in China: Project's life cycle perspective
    Chen Jianhua
    Ma Shihua
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 1076 - 1083
  • [50] Cooling tower for a pharmaceutical process cooling water system - New construction using construction management project delivery
    Parolise, Amanda
    Engineered Systems, 2019, 36 (11):