The model for the temporary rest of train based on the operation adjustment of passenger dedicated line

被引:0
|
作者
Shi, Yu [1 ]
Yang, Hao [1 ]
Chen, Ziding [1 ]
机构
[1] School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, China
来源
关键词
Functions - Railroad plant and structures - Railroad transportation - Joining;
D O I
暂无
中图分类号
学科分类号
摘要
The temporary rest of train should settle 5 interactive problems, which are the selection of the location for the temporary rest of train, the choice of the train for temporary rest, the arrangement of the joining train, the organization of the passengers' transfer and the EMU allocation after the temporary rest. The mathematical model for the temporary rest of train was established with the train running time (normal and temporary speed limit), the departing time of train from the station, the minimal interval time of the tracing trains, the actual delay time at the terminal station, and the type of the joining train at the departing station as the constraint conditions, and with the minimum total delay time at the terminal station as the objective function. With the method of computer simulation and according to different state of the trains, the model can be solved by iterative calculation. For testing the model, this paper provides a simulation experiment with the test data between Shanghai and Nanjing in the simulation test system of Jinghu high-speed railway. The experiment results indicate that the effect of the train operation adjustment can be remarkably promoted by applying the model for the temporary rest of train to reasonably arrange the joining train and the passengers' transfer based on modifying the initial EMU routing scheme.
引用
收藏
页码:109 / 115
相关论文
共 50 条
  • [31] RESEARCH ON OPERATION PLAN FOR FREIGHT SCHEDULED-TRAIN OF PASSENGER TRAIN RUNNING MODE BASED ON GENERALIZED BENEFIT MODEL
    Sun, Yang
    Zhang, Xiao-Dong
    TRANSPORT DYNAMICS, 2011, : 721 - 728
  • [32] Estimating of the Distribution Rate of Passenger Flow on Shenyang-Dalian Railway after Operation of Passenger Dedicated Line
    Wang, Chao
    Han, Baoming
    Lu, Fang
    Li, Hua
    SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 1581 - 1585
  • [33] Bi-level programming model on passenger train operation in emergency
    Wang, Li
    Zhu, Tao
    Xu, Jie
    Jin, Lei
    Qin, Yong
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2015, 45 (05): : 996 - 1001
  • [34] Study on Construction and Operation of the Passenger Dedicated Railway Line in the Process of China's Urbanization
    Niu Yongtao
    Han Baoming
    URBANIZATION AND LAND RESERVATION RESEARCH, 2009, : 1 - +
  • [35] Agent's Architecture in the Integrated Operation Dispatch System for Passenger-Dedicated Line
    Wang, Honggang
    Wang, Junyan
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 2751 - 2755
  • [36] Revenue management model for dedicated passenger line based on passengers' buy-up behavior
    Shuai, B. (bsh67@126.com), 1600, Science Press (35):
  • [37] Fuzzy k-nearest neighbor passenger flow forecasting model of passenger dedicated line
    Dou, Fei
    Jia, Limin
    Qin, Yong
    Xu, Jie
    Wang, Li
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2014, 45 (12): : 4422 - 4430
  • [38] Optimal Design of Subway Train Cross-Line Operation Scheme Based on Passenger Smart Card Data
    Li, Maosheng
    Li, Hangcong
    SUSTAINABILITY, 2022, 14 (11)
  • [39] Optimization of Cross-line Train Operation Scheme of Urban Rail Transit Based on OD Passenger Flow
    Li, Jia
    Li, Chao
    Dong, Qiuhan
    Tang, Jinjin
    SEVENTH INTERNATIONAL CONFERENCE ON TRAFFIC ENGINEERING AND TRANSPORTATION SYSTEM, ICTETS 2023, 2024, 13064
  • [40] A method of parameter design for passenger train line plan based on multi-agent Model
    Jiang, Xi
    Wu, Linke
    Bao, Yun
    ADVANCED TRANSPORTATION, PTS 1 AND 2, 2011, 97-98 : 535 - +