Medgaz IM approach predicts cost savings

被引:0
|
作者
Chaudhuri, Jay [1 ]
机构
[1] Medgaz SA, Madrid, Spain
来源
Oil and Gas Journal | 2006年 / 104卷 / 31期
关键词
Computer aided design - Cost effectiveness - Database systems - Maintenance - Water pipelines;
D O I
暂无
中图分类号
学科分类号
摘要
Running 210 km across the Alboran Sea in water 2,160 m deep, the planned Medgaz Integrity Management System (MIMS) will offer savings of 10-20% on pipeline maintenance through guaranteed up-time and risk reduction in operating the deepwater pipeline system. Integrity of the whole system has been validated through a close look on the design, construction and operation. When the evaluation of long-lead times is completed, EPIC tenders with gas will commence on early 2009.
引用
收藏
页码:57 / 60
相关论文
共 50 条
  • [41] Cost savings in continuous furnaces
    Dutton, CA
    JOURNAL OF THE AMERICAN CERAMIC SOCIETY, 1930, 13 (09) : 662 - 663
  • [42] Combining tradition with cost savings
    Dragh, Pierre
    Mudgway, Kieren
    Weng, Phoon Wai
    Agarwal, Ashish
    Erum, Frederick
    Concrete Engineering International, 2000, 4 (02):
  • [43] Cost Savings: The Authors Reply
    Hebert, Paul L.
    Liu, Chuan-Fen
    Conrad, Douglas A.
    HEALTH AFFAIRS, 2014, 33 (09)
  • [44] COST SAVINGS AT THE END OF LIFE
    MITCHELL, A
    STROUD, CE
    NEW ENGLAND JOURNAL OF MEDICINE, 1994, 331 (07): : 478 - 478
  • [45] DOCUMENTATION - A FOCUS FOR COST SAVINGS
    LUCATORTO, M
    PETRAS, DM
    DREW, LA
    ZBUCKVICH, I
    JOURNAL OF NURSING ADMINISTRATION, 1991, 21 (03): : 32 - 36
  • [46] SHOWCASE ON COST SAVINGS.
    Knebel, David E.
    ASHRAE Journal, 1986, 28 (05) : 28 - 31
  • [47] Cost savings in the operating room
    Brodsky, JB
    ANESTHESIOLOGY, 1998, 88 (03) : 834 - 834
  • [48] Cloudy with a Chance of Cost Savings
    Tak, Byung Chul
    Urgaonkar, Bhuvan
    Sivasubramaniam, Anand
    IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 2013, 24 (06) : 1223 - 1233
  • [49] BASF affirms cost savings
    不详
    CHEMICAL & ENGINEERING NEWS, 2005, 83 (28) : 15 - 15
  • [50] SAFETY PROGRAM COST SAVINGS
    RUUD, C
    MODERN CASTING, 1985, 75 (03) : 38 - 38