The study of the relationship between quality assurance personnel and quality of public construction project by using statistical inferences

被引:0
|
作者
机构
[1] Kong, Derick
[2] Wang, Lung-Chuang
[3] Hsu, Tsung-Hung
来源
Kong, D. | 1600年 / Chinese Institute of Civil and Hydraulic Engineering, 4th, FL.1, Jen-ai Rd., Sec.2, Taipei, Taiwan卷 / 25期
关键词
Analysis of variance (ANOVA);
D O I
暂无
中图分类号
学科分类号
摘要
For years, the public construction projects have played a leading role in promoting Taiwan's economy. For the purpose of improving construction quality, the public construction committee of the government plans to lower the recruiting threshold, meaning the specific contract price that contractor has to hire the full-time quality assurance personnel, from NT$50 million to NT$20 million since July, 2012. However, both the effectiveness of quality assurance personnel on construction quality and the theoretical background of the aforementioned recruiting threshold of quality assurance personnel are still in question. Therefore, the present study first collected actual public construction projects, 2,395 cases, from 2011 to 2012 and verified those data by rigorous statistical methods such as independent samples T-test and analysis of variance (ANOVA). The research result places sound foundations for setting recruiting threshold of the quality assurance personnel as well as provide references for policymaking of the public construction quality policies.
引用
收藏
相关论文
共 50 条
  • [31] Study on the Quality Control of the Concealed Works of Construction Project
    Zheng, Qian
    Wu, Xiaogang
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 1511 - 1514
  • [32] A Sociological (De)Construction of the Relationship between Status and Quality
    Lynn, Freda B.
    Podolny, Joel M.
    Tao, Lin
    AMERICAN JOURNAL OF SOCIOLOGY, 2009, 115 (03) : 755 - 804
  • [33] Analysis of relationship between quality management system and design assurance system
    Zhang, Zhao
    Song, Tao
    Song, Jiashan
    3RD INTERNATIONAL SYMPOSIUM ON AIRCRAFT AIRWORTHINESS (ISAA 2013), 2014, 80 : 565 - 572
  • [34] A STUDY OF THE RELATIONSHIP BETWEEN ROUTINE ULTRASOUND QUALITY ASSURANCE PARAMETERS AND SUBJECTIVE OPERATOR IMAGE ASSESSMENT
    METCALFE, SC
    EVANS, JA
    BRITISH JOURNAL OF RADIOLOGY, 1992, 65 (775): : 570 - 575
  • [35] Relationship between Project Managers Personality and Small Public Construction Project Success in Malaysia
    Noor, Syaharudin Shah Mohd
    Esa, Muneera
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (01): : 18 - 30
  • [36] Quality control and assurance in data collection for the Pomeranian health study project
    Adam, C
    Alte, D
    Born, G
    Härtel, U
    Sauer, S
    John, U
    GESUNDHEITSWESEN, 2000, 62 (8-9) : A101 - A101
  • [37] Questions Regarding Statistical Inferences, Quality of Life, and Conclusions From the COBRA Study
    Macarios, David
    Silverman, Ronald P.
    ANNALS OF SURGERY, 2018, 267 (03) : E58 - E59
  • [38] Relationship Between Personality Traits and Service Quality Perception of Logistics Personnel
    Kim, Young-Yei
    Tai, Simon W.
    Lee, Jung-Wan
    MANAGING SCIENCE AND TECHNOLOGY FOR A SUSTAINABLE FUTURE: WASD 2008 CONFERENCE PROCEEDINGS, 2008, : 357 - 365
  • [39] Simulating quality assurance and efficiency analysis between construction management and engineering geodesy
    Rinke, Nils
    von Goesseln, Ilka
    Kochkine, Vitali
    Schweitzer, Juergen
    Berkhahn, Volker
    Berner, Fritz
    Kutterer, Hansjoerg
    Neumann, Ingo
    Schwieger, Volker
    AUTOMATION IN CONSTRUCTION, 2017, 76 : 24 - 35
  • [40] The relationship between the quality of active frontages and public perceptions of public spaces
    Emma Heffernan
    Troy Heffernan
    Wei Pan
    URBAN DESIGN International, 2014, 19 : 92 - 102