Modeling test research on failure mechanism of shield tunnel crossing ground fissure with 60°

被引:0
|
作者
Hu, Zhiping [1 ]
Peng, Jianbing [2 ]
Wang, Qiyao [1 ]
Zhu, Qidong [1 ]
Zhao, Zhenrong [1 ]
机构
[1] School of Civil Engineering, Chang'an University, Xi'an, Shaanxi 710061, China
[2] School of Geology Engineering and Geomatics, Chang'an University, Xi'an, Shaanxi 710054, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:176 / 183
相关论文
共 50 条
  • [31] Simulation test of metro tunnel parallels ground fissure with short distance
    Peng, Jianbing (dicexy_1@chd.edu.cn), 1600, Academia Sinica (33):
  • [32] Experimental Study on Deformation Mechanism of a Utility Tunnel in a Ground Fissure Area
    Zhang, Dan
    Hu, Zhiping
    Lu, Ganggang
    Wang, Rui
    Ren, Xiang
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2020, 2020
  • [33] Comparison study of mechanical characteristics between conventional shield tunnel and shield tunnel with mortise-groove cross-section in ground fissure site
    School of Civil Engineering, Xi’an University of Architecture and Technology, Xi’an, China
    J. Asian Archit. Build. Eng.,
  • [34] Comparison study of mechanical characteristics between conventional shield tunnel and shield tunnel with mortise-groove cross-section in ground fissure site
    Yin, Tao
    Su, Sanqing
    Cao, Zhen
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2025, 24 (02) : 706 - 729
  • [35] Failure analysis and treatments of a loess tunnel being constructed in ground fissure area
    Ma, Enlin
    Lai, Jinxing
    Xu, Shuoshuo
    Shi, Xinghao
    Zhang, Jian
    Zhong, Yujian
    ENGINEERING FAILURE ANALYSIS, 2022, 134
  • [36] Failure mechanism of underwater shield tunnel: An experimental and theoretical study
    Liang, Kun
    Feng, Kun
    Zhang, Li
    He, Chuan
    Su, Ang
    Guo, Wenqi
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 137
  • [37] Model test for influence of ground fissure profile pattern on deformation of metro tunnel
    Li Kai-ling
    Men Yu-ming
    Liu Yang
    Jiang Rong
    ROCK AND SOIL MECHANICS, 2011, 32 (06) : 1690 - 1696
  • [38] Ground deformation mechanism around a shield tunnel by the passage of the tail void
    Katoh, Y
    Miyake, M
    Wada, M
    Yatomi, C
    Suzuki, Y
    PRE-FAILURE DEFORMATION CHARACTERISTICS OF GEOMATERIALS, VOL 1, 1999, : 725 - 730
  • [39] Test study of 3d deformation feature of special movement joint of sectional horseshoe-shaped tunnel crossing ground fissure
    School of Civil Engineering, Chang'an University, Xi'an, Shaanxi 710061, China
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2009, 12 (2475-2481):
  • [40] Prototype test on failure mechanism of shield tunnel with reinforced concrete inner lining under internal water pressure
    Zhang D.
    Bu X.
    Zhou W.
    Jiang Y.
    Jia K.
    Yang G.
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2023, 56 (06): : 126 - 135