Real-time dynamic operation of reservoir water levels during flood season based on integrated information

被引:0
|
作者
Wang, Ben-De [1 ]
Yuan, Jing-Xuan [1 ]
机构
[1] School of Hydraulic Engineering, Dalian University of Technology, Dalian 116024, China
关键词
Hydroelectric power plants - Flood control - Floods - Weather forecasting - Hydroelectric power - Rain - Water levels;
D O I
暂无
中图分类号
学科分类号
摘要
In order to improve flood water utilization rate during flood season, a real-time dynamic operation of reservoir water levels called improved pre-storage & pre-discharge method is presented, in which real-time information of flood, rainfall, engineering and short-term flood and rainfall forecast issue is studied synthetically. Through its application to Huanren Reservoir and gradient reservoir group, and compared with the originally designed flood operation of reservoir, the results show that the real-time dynamic operation method based on integrated information can increase hydropower generation without increasing flood risk. The method is feasible and practical, and it can also be applied to other reservoirs, especially to the large-scale reservoir or hydropower station for real-time operation in the water shortage region of North China.
引用
收藏
页码:570 / 575
相关论文
共 50 条
  • [31] Improved Risk-Assessment Model for Real-Time Reservoir Flood-Control Operation
    Chen, Juan
    Zhong, Ping-an
    Zhang, Weiguo
    Zhu, Feilin
    Zhang, Yu
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2020, 146 (03)
  • [32] Evaluation of Real-Time Operation Rules in Reservoir Systems Operation
    Bolouri-Yazdeli, Y.
    Bozorg-Haddad, Omid
    Fallah-Mehdipour, E.
    Marino, M. A.
    WATER RESOURCES MANAGEMENT, 2014, 28 (03) : 715 - 729
  • [33] Evaluation of Real-Time Operation Rules in Reservoir Systems Operation
    Y. Bolouri-Yazdeli
    O. Bozorg Haddad
    E. Fallah-Mehdipour
    M. A. Mariño
    Water Resources Management, 2014, 28 : 715 - 729
  • [34] GA-based nonlinear optimization for real-time reservoir operation
    Celeste, AB
    Suzuki, K
    Watanabe, M
    Kadota, A
    ADVANCES IN HYDRAULICS AND WATER ENGINEERING, VOLS 1 AND 2, PROCEEDINGS, 2002, : 580 - 585
  • [35] Ensemble hydrological prediction-based real-time optimization of a multiobjective reservoir during flood season in a semiarid basin with global numerical weather predictions
    Wang, Fuxing
    Wang, Lei
    Zhou, Huicheng
    Valeriano, Oliver C. Saavedra
    Koike, Toshio
    Li, Wenlong
    WATER RESOURCES RESEARCH, 2012, 48
  • [36] RISK-BASED PERFORMANCE CRITERIA FOR REAL-TIME RESERVOIR OPERATION
    BURN, DH
    VENEMA, HD
    SIMONOVIC, SP
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1991, 18 (01) : 36 - 42
  • [37] A Risk-Based Model for Real-Time Flood Control Operation of a Cascade Reservoir System under Emergency Conditions
    Chen, Juan
    Zhong, Ping-an
    Wang, Man-lin
    Zhu, Fei-lin
    Wan, Xin-yu
    Zhang, Yu
    WATER, 2018, 10 (02):
  • [38] Integrated Hydrologic and Reservoir Routing Model for Real-Time Water Level Forecasts
    Deng, Chao
    Liu, Pan
    Liu, Yue
    Wu, Zhaohui
    Wang, Dingbao
    JOURNAL OF HYDROLOGIC ENGINEERING, 2015, 20 (09)
  • [39] Analysis of the Three Gorges Reservoir operation on the water level of Yangtze River during the non-flood season
    Zheng, Jing
    ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 864-867 : 2207 - 2212
  • [40] COMPARISON OF REAL-TIME RESERVOIR-OPERATION TECHNIQUES
    YANG, XL
    PARENT, E
    MICHEL, C
    ROCHE, PA
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 1995, 121 (05) : 345 - 351