Real-time dynamic operation of reservoir water levels during flood season based on integrated information

被引:0
|
作者
Wang, Ben-De [1 ]
Yuan, Jing-Xuan [1 ]
机构
[1] School of Hydraulic Engineering, Dalian University of Technology, Dalian 116024, China
关键词
Hydroelectric power plants - Flood control - Floods - Weather forecasting - Hydroelectric power - Rain - Water levels;
D O I
暂无
中图分类号
学科分类号
摘要
In order to improve flood water utilization rate during flood season, a real-time dynamic operation of reservoir water levels called improved pre-storage & pre-discharge method is presented, in which real-time information of flood, rainfall, engineering and short-term flood and rainfall forecast issue is studied synthetically. Through its application to Huanren Reservoir and gradient reservoir group, and compared with the originally designed flood operation of reservoir, the results show that the real-time dynamic operation method based on integrated information can increase hydropower generation without increasing flood risk. The method is feasible and practical, and it can also be applied to other reservoirs, especially to the large-scale reservoir or hydropower station for real-time operation in the water shortage region of North China.
引用
收藏
页码:570 / 575
相关论文
共 50 条
  • [1] Improving real-time reservoir operation during flood season by making the most of streamflow forecasts
    Wang, Jiabiao
    Zhao, Tongtiegang
    Zhao, Jianshi
    Wang, Hao
    Lei, Xiaohui
    JOURNAL OF HYDROLOGY, 2021, 595
  • [2] Real-time reservoir flood operation during typhoon attacks
    Huang, Wen -Cheng
    Hsieh, Chi -Liang
    WATER RESOURCES RESEARCH, 2010, 46
  • [3] Refining hydropower operation by dynamic control of cascade reservoir water levels with flood season segmentation
    He, Shaokun
    Li, Binbin
    Li, Qianxun
    Zheng, Hezhen
    Chen, Yingjian
    ENERGY, 2025, 314
  • [4] Reservoir Flood Season Segmentation and Optimal Operation of Flood-Limiting Water Levels
    Jiang, Haiyan
    Yu, Zhongbo
    Mo, Chongxun
    JOURNAL OF HYDROLOGIC ENGINEERING, 2015, 20 (09)
  • [5] Risk Analysis for Real-Time Flood Control Operation of a Reservoir
    Chen, Juan
    Zhong, Ping-an
    Xu, Bin
    Zhao, Yun-fa
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2015, 141 (08)
  • [6] A multipurpose reservoir real-time operation model for flood control during typhoon invasion
    Hsu, Nien-Sheng
    Wei, Chih-Chiang
    JOURNAL OF HYDROLOGY, 2007, 336 (3-4) : 282 - 293
  • [7] Real-time reservoir flood control operation enhanced by data assimilation
    Zhang, Jingwen
    Cai, Ximing
    Lei, Xiaohui
    Liu, Pan
    Wang, Hao
    JOURNAL OF HYDROLOGY, 2021, 598
  • [8] A real-time operation of the Three Gorges Reservoir with flood risk analysis
    Sun, Yixiang
    Tang, Deshan
    Dai, Huichao
    Liu, Pan
    Sun, Yifei
    Cui, Qingfeng
    Zhang, Fanping
    Ding, Yifan
    Wei, Yuhang
    Zhang, Jinxin
    Wang, Mei
    Li, Aodian
    Meng, Zhenzhu
    WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, 2016, 16 (02): : 551 - 562
  • [9] Near Real-Time Optimization of Multi-Reservoir during Flood Season in the Fengman Basin of China
    Wang, Fuxing
    Valeriano, Oliver C. Saavedra
    Sun, Xinguo
    WATER RESOURCES MANAGEMENT, 2013, 27 (12) : 4315 - 4335
  • [10] Near Real-Time Optimization of Multi-Reservoir during Flood Season in the Fengman Basin of China
    Fuxing Wang
    Oliver C. Saavedra Valeriano
    Xinguo Sun
    Water Resources Management, 2013, 27 : 4315 - 4335