共 50 条
- [41] Proposal for territorial distribution of the 2010 EU road safety target ACCIDENT ANALYSIS AND PREVENTION, 2009, 41 (05): : 1008 - 1015
- [44] The proposal for the construction of a road link as an underwater tunnel - Produced by incremental launching method BAUINGENIEUR, 2014, 89 : 28 - 31
- [47] Safety Risk Management Mode for Road nearby Shallow Tunnel EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 3758 - 3762
- [50] Traffic management and safety in a road three-tunnel system Transport and City Tunnels - Proceedings of the 11th International Conference Underground Constructions Prague 2010, 2010, : 818 - 823