共 50 条
- [41] Study on Electric Field Distribution Characteristics of Live-Working and Protection for Crossing Project of 1000kV-Over-500kV AC Transmission Lines Dianwang Jishu/Power System Technology, 2019, 43 (01): : 349 - 355
- [42] Lightning Back-Flash Performance of 220kV AC Quadruple-circuit Transmission Lines on the Same Tower 2010 ASIA-PACIFIC INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY & TECHNICAL EXHIBITION ON EMC RF/MICROWAVE MEASUREMENTS & INSTRUMENTATION, 2010, : 1570 - 1573
- [43] Experimental analysis of live working on 750 kV compact double circuits transmission line on the same tower Gaodianya Jishu/High Voltage Engineering, 2010, 36 (11): : 2863 - 2868
- [44] Bundle conductor minimum ground clearance of 1000 kV AC UHV transmission lines Dianli Zidonghua Shebei / Electric Power Automation Equipment, 2008, 28 (01): : 17 - 22
- [45] Design of 500 kV AC double-circuit transmission line on the same tower located at 20 mm heavy icing area Dianwang Jishu/Power System Technology, 2015, 39 (01): : 123 - 129
- [46] Key technologies of 1000 kV AC compact transmission Gaodianya Jishu/High Voltage Engineering, 2011, 37 (08): : 1825 - 1831
- [47] Back-flashover resistance level of ±800 kV/500 kV AC-DC hybrid transmission lines Dianli Zidonghua Shebei Electr. Power Autom. Equip., 10 (101-106 and 114):
- [48] Analysis and measurement of radio-frequency interfernce due to the corona from 500kV transmission lines IEEE 2000 TENCON PROCEEDINGS, VOLS I-III: INTELLIGENT SYSTEMS AND TECHNOLOGIES FOR THE NEW MILLENNIUM, 2000, : 88 - 91
- [49] Trip-out analysis of 110 kV double-circuit transmission lines and other lines partly on same tower Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (09): : 80 - 83