Minslack and kangaroo algorithms for fuzzy project scheduling problems

被引:0
|
作者
Atli, Omer [1 ]
Kahraman, Cengiz [2 ]
机构
[1] Aeronautics and Space Technologies Institute, Turkish Air Force Academy Yesilyurt, Bakirkoy, Istanbul 34149, Turkey
[2] Department of Industrial Engineering, Istanbul Technical University, Istanbul, Turkey
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:189 / 219
相关论文
共 50 条
  • [22] Software Project Scheduling with Genetic Algorithms
    Lv Jianhong
    Yang Zhigang
    ISTM/2009: 8TH INTERNATIONAL SYMPOSIUM ON TEST AND MEASUREMENT, VOLS 1-6, 2009, : 3567 - 3570
  • [23] Evolutionary Algorithms for Resource Constrained Project Scheduling Problems: Current Issues & Future Directions
    Chand, Shelvin
    PROCEEDINGS OF THE 2016 IEEE REGION 10 CONFERENCE (TENCON), 2016, : 2202 - 2204
  • [24] Modified genetic algorithms for solving fuzzy flow shop scheduling problems and their implementation with CUDA
    Huang, Chieh-Sen
    Huang, Yi-Chen
    Lai, Peng-Jen
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (05) : 4999 - 5005
  • [25] Criticality measurement in fuzzy project scheduling
    Ammar, Mohammad A.
    Abd-ElKhalek, Sherif I.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 252 - 261
  • [26] Fuzzy random project scheduling problem
    Ke, Hua
    Liu, Baoding
    Proceedings of the Fourth International Conference on Information and Management Sciences, 2005, 4 : 427 - 432
  • [27] Fuzzy project scheduling with multiple criteria
    Hapke, M
    Jaszkiewicz, A
    Slowinski, R
    PROCEEDINGS OF THE SIXTH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS I - III, 1997, : 1277 - 1282
  • [28] A metaheuristic approach to fuzzy project scheduling
    Pan, HQ
    Yeh, CH
    KNOWLEDGE-BASED INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, PT 1, PROCEEDINGS, 2003, 2773 : 1081 - 1087
  • [29] Fuzzy project scheduling with multiple objectives
    Pan, HQ
    Yeh, CH
    PRICAI 2004: TRENDS IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2004, 3157 : 1011 - 1012
  • [30] Fuzzy priority heuristics for project scheduling
    Hapke, M
    Slowinski, R
    FUZZY SETS AND SYSTEMS, 1996, 83 (03) : 291 - 299