Minslack and kangaroo algorithms for fuzzy project scheduling problems

被引:0
|
作者
Atli, Omer [1 ]
Kahraman, Cengiz [2 ]
机构
[1] Aeronautics and Space Technologies Institute, Turkish Air Force Academy Yesilyurt, Bakirkoy, Istanbul 34149, Turkey
[2] Department of Industrial Engineering, Istanbul Technical University, Istanbul, Turkey
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:189 / 219
相关论文
共 50 条
  • [1] Minslack and Kangaroo Algorithms for Fuzzy Project Scheduling Problems
    Atli, Omer
    Kahraman, Cengiz
    JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2013, 20 (1-2) : 189 - 219
  • [2] Models and algorithms for fuzzy random scheduling problems
    Jin, P
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 1920 - 1925
  • [3] GENETIC ALGORITHMS AND NEIGHBORHOOD SEARCH ALGORITHMS FOR FUZZY FLOWSHOP SCHEDULING PROBLEMS
    ISHIBUCHI, H
    YAMAMOTO, N
    MURATA, T
    TANAKA, H
    FUZZY SETS AND SYSTEMS, 1994, 67 (01) : 81 - 100
  • [4] Fuzzy project scheduling
    Pan, HQ
    Yeh, CH
    PROCEEDINGS OF THE 12TH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1 AND 2, 2003, : 755 - 760
  • [5] Solving the fuzzy earliness and tardiness in scheduling problems by using genetic algorithms
    Wu, Hsien-Chung
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (07) : 4860 - 4866
  • [6] SOLVING THE FUZZY PROJECT SCHEDULING PROBLEMS WITH META-HEURISTIC METHODS
    Kokcam, Abdullah H.
    Engin, Orhan
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2010, 28 (02): : 86 - 101
  • [7] Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms
    A. Kaveh
    M. Khanzadi
    M. Alipour
    International Journal of Civil Engineering, 2016, 14 : 325 - 337
  • [8] Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms
    Kaveh, A.
    Khanzadi, M.
    Alipour, M.
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2016, 14 (5A) : 325 - 337
  • [9] Evolutionary algorithms applied to project scheduling problems - a survey of the state-of-the-art
    Lancaster, John
    Ozbayrak, Mustafa
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (02) : 425 - 450
  • [10] Solving Resource-Constraint Project Scheduling Problems Based on ACO Algorithms
    Gonzalez-Pardo, Antonio
    Camacho, David
    SWARM INTELLIGENCE, ANTS 2014, 2014, 8667 : 290 - 291