共 50 条
- [41] A MATRIX REPRESENTATION OF THE CPM/PDD APPROACH AS A MEANS FOR CHANGE IMPACT ANALYSIS 10TH INTERNATIONAL DESIGN CONFERENCE - DESIGN 2008, VOLS 1 AND 2, 2008, (48): : 167 - +
- [43] A Framework for Business Process Change Requirements Analysis DESIGN REQUIREMENTS ENGINEERING: A TEN-YEAR PERSPECTIVE, 2009, 14 : 327 - 351
- [44] The Requirements change Analysis for Different level users 2008 INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION WORKSHOP: IITA 2008 WORKSHOPS, PROCEEDINGS, 2008, : 987 - 989
- [45] Military Equipment Requirements Analysis Approach EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 5665 - 5668
- [46] The SCR approach to requirements specification and analysis RE '97 - PROCEEDINGS OF THE THIRD IEEE INTERNATIONAL SYMPOSIUM ON REQUIREMENTS ENGINEERING, 1997, : 263 - 263
- [47] An Approach towards Automation of Requirements Analysis IMECS 2009: INTERNATIONAL MULTI-CONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2009, : 1080 - +
- [49] Impact of Climate Change on Crop Irrigation Requirements in Arid Regions Water Resources Management, 2023, 37 : 1965 - 1984
- [50] Climate change impact on crop water requirements in arid Rajasthan JOURNAL OF AGROMETEOROLOGY, 2011, 13 (01): : 17 - 24