Technical solutions to reduce time and cost in dam design and construction

被引:0
|
作者
Moreno, F. Javier Baztán [1 ]
机构
[1] Canales y Puertos, Vocal Titular del Comité Español de Grandes Presas
来源
Revista de Obras Publicas | 2007年 / 154卷 / 3475期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:7 / 26
相关论文
共 50 条
  • [31] Technical solutions to prevent/reduce soil damaging compaction
    Sommer, C
    Brunotte, J
    ZUCKERINDUSTRIE, 2004, 129 (09): : 657 - 659
  • [32] HOW TO REDUCE DESIGN AND CONSTRUCTION ERRORS
    REICHART, G
    NUCLEAR ENGINEERING AND DESIGN, 1988, 110 (02) : 251 - 254
  • [33] Technical solutions to reduce and to control the noise load in the Netherlands
    Bekebrede, Gerard
    Proceedings - International Conference on Noise Control Engineering, 1991, 2
  • [34] DESIGN OPTIONS REDUCE EXCHANGER COST
    RAO, KR
    SHRINIVASA, U
    SRINIVASAN, J
    HYDROCARBON PROCESSING, 1990, 69 (12): : 81 - 83
  • [35] TECHNICAL AND COST DATA FOR REACTOR DESIGN
    LANE, JA
    NUCLEONICS, 1954, 12 (04): : 12 - 14
  • [36] Rock Slope Stabilization at Boundary Dam: Using Phased Design and Construction and 3D Modeling to Reduce Risk
    Senior, Mike
    Shull, Phil
    Rutledge, Alex
    Brown, Jeremy
    Ball, Andre
    IFCEE 2021: EARTH RETENTION, GROUND IMPROVEMENT, AND SEEPAGE CONTROL, 2021, 324 : 85 - 98
  • [37] Design and construction of Morocco's Aoulouz RCC dam
    Chraibi, A.F.
    Sterenberg, J.
    International Water Power and Dam Construction, 1991, 43 (03): : 33 - 35
  • [38] DESIGN AND CONSTRUCTION OF THE LENIHAN DAM OUTLET TUNNEL AND SHAFT
    Desai, Hemang
    Mainer, Brett
    Murray, Mike
    Spreng, Shawn
    2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 171 - +
  • [39] CURRENT TAILINGS DAM DESIGN AND CONSTRUCTION METHODS.
    Klohn, Earle J.
    Mining Engineering, 1981, 33 (07) : 798 - 808
  • [40] DESIGN, CONSTRUCTION AND PERFORMANCE OF COW GREEN EMBANKMENT DAM
    VAUGHAN, PR
    LOVENBURY, HT
    HORSWILL, P
    GEOTECHNIQUE, 1975, 25 (03): : 555 - 580