A two-layer low-carbon economic planning method for park-level integrated energy systems with carbon-energy synergistic hub

被引:0
|
作者
Mu, Yunfei [1 ,2 ]
Guo, Haochen [1 ,2 ]
Wu, Zhijun [1 ,2 ]
Jia, Hongjie [1 ,2 ]
Jin, Xiaolong [1 ,2 ]
Qi, Yan [3 ]
机构
[1] Tianjin Univ, Key Lab Smart Grid, Minist Educ, Tianjin 300072, Peoples R China
[2] Tianjin Univ, Key Lab Smart Energy & Informat Technol, Tianjin 300072, Peoples R China
[3] State Grid Tianjin Elect Power Co, Tianjin Elect Power Res Inst, Tianjin 300384, Peoples R China
基金
中国国家自然科学基金;
关键词
Low-carbon economic planning; Carbon-energy synergistic hub (CESH); Carbon energy friendly interactions; Carbon trading market; Park-level integrated energy system (PIES);
D O I
10.1016/j.egyai.2024.100435
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Building a low-carbon park is crucial for achieving the carbon neutrality goals. However, most research on lowcarbon economic planning methods for park-level integrated energy systems (PIES) has focused on multi-energy flow interactions, neglecting the "carbon perspective" and the impact of the dynamic coupling characteristics between multi-energy flows and carbon emission flow (CEF) on carbon reduction and planning schemes. Therefore, this paper proposes a two-layer low-carbon economic planning method for park-level integrated energy systems with carbon-energy synergistic hub (CESH). Firstly, this paper establishes a CESH model for PIES to describe the synergistic relationship between CEF and multi-energy flows from input, conversion, storage, to output. Secondly, a PIES two-layer low-carbon economic planning model with CESH is proposed. The upper model determines the optimal device types and capacities during the planning cycle. The lower model employs the CESH model to promote carbon energy friendly interactions, optimize the daily operation scheme of PIES. The iterative process between the two layers, initiated by a genetic algorithm (GA), ensures the speed and accuracy. Finally, case studies show that, compared to planning methods without the CESH model, the proposed method is effective in reducing carbon emissions and total costs during the planning cycle. From a dual "carbonenergy" perspective, it enhances investment effectiveness and carbon reduction sensitivity by deeply exploring the energy conservation and carbon reduction potential of PIES.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Low-carbon robust economic dispatch of park-level integrated energy system considering price-based demand response and vehicle-to-grid
    Lyu, Xiangmei
    Liu, Tianqi
    Liu, Xuan
    He, Chuan
    Nan, Lu
    Zeng, Hong
    ENERGY, 2023, 263
  • [22] Low-carbon Economic Dispatch Method of Park Integrated Energy System Considering Cross-seasonal Energy Storage
    Yan N.
    Ma G.
    Li X.
    Ma S.
    Gaodianya Jishu/High Voltage Engineering, 2023, 49 (10): : 4182 - 4191
  • [23] Low-carbon Operation Method of Integrated Energy System in Ecological Park Considering Carbon Footprint
    Sun, Pei
    Zheng, Zhen
    Yang, Xingang
    Du, Yang
    Wang, Weitao
    Wang, Lingling
    2022 IEEE/IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (I&CPS ASIA 2022), 2022, : 749 - 755
  • [24] Low-carbon Economic Dispatch of Park Integrated Energy System Based on Seasonal Carbon Trading Mechanism
    Yan N.
    Ma G.
    Li X.
    Li Y.
    Ma S.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2024, 44 (03): : 918 - 931
  • [25] Multi-stage coordinated planning of energy stations and networks in park-level integrated energy systems
    Qiu, Yue
    Yao, Yunting
    Zhou, Suyang
    Zhang, Hanlin
    Bao, Yuqing
    IET RENEWABLE POWER GENERATION, 2024, 18 : 4543 - 4564
  • [26] Optimal Co-planning of Park-level Integrated Heat and Electricity Energy Systems
    Wang, Fuyue
    Liu, Haoming
    Chen, Yuming
    Wu, Junji
    Yang, Bin
    Ruan, Wenjun
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRIC POWER AND ENERGY CONVERSION SYSTEMS (EPECS), 2018,
  • [27] Flexible dispatching method for park-level integrated energy systems considering energy cascade utilization
    Chen, Zhanpeng
    Hu, Yan
    Tai, Nengling
    Fan, Feilong
    Huang, Wentao
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2023, 17 (02) : 497 - 514
  • [28] Low-carbon economic dispatch and energy sharing method of multiple Integrated Energy Systems from the perspective of System of Systems
    Huang, Yujing
    Wang, Yudong
    Liu, Nian
    ENERGY, 2022, 244
  • [29] A planning method for park-level integrated energy system based on system integration theory
    Wang, Huiyuan
    Jia, Chaoyu
    Jia, Hongjie
    Mu, Yunfei
    Xu, Xiandong
    Yu, Xiaodan
    APPLIED ENERGY, 2025, 388
  • [30] Exergy-economic analysis and evaluation method of park-level integrated energy system
    Mo, Lili
    Liu, Xin
    Chen, Haoyong
    Zhao, Zhendong
    Chen, Jinbin
    Deng, Zeyu
    FRONTIERS IN ENERGY RESEARCH, 2022, 10