Clip and build part two

被引:0
|
作者
Knutt, Elaine
机构
来源
Building Engineer | 2021年 / 96卷 / 04期
关键词
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
Giving residents a voice on safety issues has been a key principle of the new legislation. While other organizations may be responsible for day-to-day communications, the e-newsletters, posters and letter drops, the building safety manager (BSM) will be responsible for ensuring that the right information gets into residents’ hands at the right time. Good practice would be for others to maintain the ongoing relationship, but the BSM would be responsible if it doesn’t happen appropriately. Residents will take on their own statutory responsibilities, including a duty to co-operate with the BSM and not to undertake works or act in a way that impinges on the safety of others, such as refusing access to a property for safety checks.
引用
收藏
页码:22 / 23
相关论文
共 50 条
  • [31] A volumetric approach to part-build orientations in rapid prototyping
    Rattanawong, W
    Masood, SH
    Iovenitti, P
    JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2001, 119 (1-3) : 348 - 353
  • [32] TWI helps build the future as part of a £2.7 m project
    不详
    INSIGHT, 2002, 44 (05) : 270 - 270
  • [33] Genome build information is an essential part of genomic track files
    Kanduri, Chakravarthi
    Domanska, Diana
    Hovig, Eivind
    Sandve, Geir Kjetil
    GENOME BIOLOGY, 2017, 18
  • [34] Genome build information is an essential part of genomic track files
    Chakravarthi Kanduri
    Diana Domanska
    Eivind Hovig
    Geir Kjetil Sandve
    Genome Biology, 18
  • [35] Optimising build parameters and hatch style for part accuracy in Stereolithography
    Onuh, SO
    Hon, KKB
    SOLID FREEFORM FABRICATION PROCEEDINGS, SEPTEMBER 1997, 1997, : 653 - 660
  • [36] A Numerical Approach to Measure the Surface Roughness of FDM Build Part
    Haque, M. Ehsanul
    Banerjee, Dipabrata
    Mishra, Swayam Bikash
    Nanda, Basanta Kumar
    MATERIALS TODAY-PROCEEDINGS, 2019, 18 : 5523 - 5529
  • [37] How to build a pyramid, Part II ... (using inflated offal)
    Bishop, RI
    PROFESSIONAL ENGINEERING, 2000, 13 (03) : 17 - 17
  • [38] Two-stage meta-heuristic for part-packing and build-scheduling problem in parallel additive manufacturing
    Lee, Seung Jae
    Kim, Byung Soo
    APPLIED SOFT COMPUTING, 2023, 136
  • [39] Acetyls - Hoechst to build two Singapore facilities
    不详
    EUROPEAN CHEMICAL NEWS, 1997, 67 (1767): : 26 - 26
  • [40] Two firms to build potential Humvee replacement
    Jane's Def. Weekly, 2006, FEB. (311-312):