Risk-Based Prioritization Method for Rescheduling Delayed Preventive Maintenance of Electric Power Transmission Assets

被引:0
|
作者
Shaulagara, Shaga [1 ]
Fazlurrahman, Verly [1 ]
Riyandhini, Hening Putri [1 ]
机构
[1] Engineering Upt Durikosambi, Pt Pln (PERSERO) Uitjbb, Jakarta, Indonesia
关键词
Compilation and indexing terms; Copyright 2024 Elsevier Inc;
D O I
4th International Conference on High Voltage Engineering and Power Systems, ICHVEPS 2023
中图分类号
学科分类号
摘要
Condition based maintenance - Decision making - Electric power transmission - Electric power transmission networks - Electric substations - Risk assessment - Transmissions
引用
收藏
页码:25 / 28
相关论文
共 50 条
  • [31] Scheduling maintenance activities of electric power transmission networks using an hybrid constraint method
    Gomes, Nuno
    Pinheiro, Raul
    Vale, Zita
    Ramos, Carlos
    ENGINEERING INTELLIGENT SYSTEMS FOR ELECTRICAL ENGINEERING AND COMMUNICATIONS, 2007, 15 (03): : 127 - 134
  • [32] Method of preventive maintenance and plan for natural gas pipelines based on risk inspection
    Yi Jun
    Wang Wenhe
    Xu Zhisheng
    Zhao Ling
    DISASTER ADVANCES, 2012, 5 (04): : 1167 - 1171
  • [33] A Risk-Based Approach to Automate Preventive Maintenance Tasks Generation by Exploiting Autonomous Robot Inspections in Wind Farms
    Leonardi, Fabio
    Messina, Fabrizio
    Santor, Corrado
    IEEE ACCESS, 2019, 7 : 49568 - 49579
  • [34] Optimal preventive maintenance policy for electric power distribution systems based on the fuzzy AHP methods
    Firouz, Mansour Hosseini
    Ghadimi, Noradin
    COMPLEXITY, 2016, 21 (06) : 70 - 88
  • [35] Risk Analysis of Central Java']Java Gas Transmission Pipeline by Risk-Based Inspection Method
    Mediansyah
    Haryadi, G. D.
    Ismail, R.
    Kim, S. J.
    4TH INTERNATIONAL CONFERENCE ON ADVANCED MATERIALS SCIENCE AND TECHNOLOGY, 2016, 2017, 202
  • [36] Cost-Benefit for HV Transmission Line Renovation and Replacement Based on Failure Probability and Risk-Based Maintenance
    Suwanasri, Cattareeya
    Suwanasri, Thanapong
    Luejai, Waraporn
    Saribut, Surapol
    PROCEEDINGS OF THE 21ST INTERNATIONAL SYMPOSIUM ON HIGH VOLTAGE ENGINEERING, VOL 1, 2020, 598 : 197 - 207
  • [37] Development of Risk-based Railway Track Maintenance Method Using Image Analysis Technology
    Shimizu A.
    Miwa M.
    Quarterly Report of RTRI (Railway Technical Research Institute), 2019, 60 (04) : 262 - 267
  • [38] Risk-based Dynamic Security Assessment under Typhoon Weather for Power Transmission System
    Song, Xiaozhe
    Wang, Zhen
    Xin, Huanhai
    Gan, Deqiang
    2013 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2013,
  • [39] Risk-based preventive-corrective security constrained optimal power flow for ac/dc grid
    Bhardwaj, Vaishally
    Ergun, Hakan
    Van Hertem, Dirk
    2021 IEEE MADRID POWERTECH, 2021,
  • [40] A Prioritization Method for Switchgear Maintenance Based on Equipment Failure Mode Analysis and Integrated Risk Assessment
    Zhou, Nan
    Xu, Yan
    IEEE TRANSACTIONS ON POWER DELIVERY, 2024, 39 (02) : 728 - 739