Open-Pit Mine Backfilling with External Soil Material

被引:0
|
作者
Waerder, Thomas [1 ]
机构
[1] Dezernat 62, Abteilung Bergbau und Energie in NRW, Bezirksregierung Arnsberg, Dortmund, Germany
关键词
D O I
暂无
中图分类号
学科分类号
摘要
4
引用
收藏
页码:450 / 454
相关论文
共 50 条
  • [21] Rock bolting at the Flambeau open-pit mine
    Yost, R
    E&MJ-ENGINEERING AND MINING JOURNAL, 1997, 198 (09): : 58 - 62
  • [22] A STUDY OF RADIATION PARAMETERS IN AN OPEN-PIT MINE
    LEACH, VA
    LOKAN, KH
    MARTIN, LJ
    HEALTH PHYSICS, 1982, 43 (03): : 363 - 375
  • [23] MODELING AN OPEN-PIT MINE IN A MULTITEST STATEMENT
    NAZAROV, IV
    KORTELEV, OB
    JOURNAL OF MINING SCIENCE, 1993, 29 (05) : 434 - 439
  • [24] SUWANNEE RIVER IS SAFEST OPEN-PIT MINE
    不详
    AMERICAN MINING CONGRESS JOURNAL, 1983, 69 (01): : 10 - 10
  • [25] OPEN-PIT MINE DESIGN IN SEISMIC AREAS
    DEVALLEJO, LG
    ELDRED, PJL
    OTEO, CS
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1984, 93 (OCT): : A192 - A197
  • [26] Scheduling of open-pit phosphate mine extraction
    Azzamouri, Ahlam
    Fenies, Pierre
    Fontane, Frederic
    Giard, Vincent
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (23) : 7122 - 7141
  • [27] Optimized Transportation of the Open-pit Coal Mine
    Cai B.
    Hao J.
    Zhu H.
    Chen H.
    Journal of Engineering Science and Technology Review, 2022, 15 (04) : 90 - 95
  • [28] CUTOFFS GRADE CALCULATIONS FOR AN OPEN-PIT MINE
    JOHN, HT
    CIM BULLETIN, 1985, 78 (879): : 73 - 75
  • [29] Buckling failure at an open-pit coal mine
    Aydan, O
    Ulusay, R
    Kumsar, H
    Ersen, A
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 641 - 648
  • [30] Open-Pit Mine Optimization with Maximum Satisfiability
    Matthew Deutsch
    Mining, Metallurgy & Exploration, 2019, 36 : 757 - 764