Toward Construction 4.0: A Hybrid Centralized-Decentralized UML Model for Enhancing Procurement and Inventory in Construction Projects

被引:0
|
作者
Mohammed, Ayman R. [1 ,2 ]
Abdelkhalek, Ebrahim [3 ,4 ]
Saleh, Haitham [1 ,2 ]
Attia, Ahmed M. [1 ,2 ]
Al Hanbali, Ahmad [1 ,2 ]
机构
[1] King Fahd Univ Petr & Minerals KFUPM, Dept Ind & Syst Engn, Dhahran 31261, Saudi Arabia
[2] KFUPM, Interdisciplinary Res Ctr Smart Mobil & Logist, Dhahran 31261, Saudi Arabia
[3] Univ Bath, Dept Comp Sci, Bath BA2 7AY, England
[4] Isam Khairi Kabbani Grp IKK, Kabbani Architectural Concepts KAC, Business Intelligence Unit BIU, Al Khobar 34433, Saudi Arabia
来源
IEEE ACCESS | 2024年 / 12卷
关键词
Unified modeling language; Inventory management; Procurement; Solid modeling; Adaptation models; Construction industry; Fourth Industrial Revolution; Web services; Centralized inventory management; Construction; 4.0; real-time inventory tracking; UML model; web-based inventory system application; MANAGEMENT; INDUSTRY;
D O I
10.1109/ACCESS.2024.3465432
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In construction projects, delays and budget overruns often stem from inefficient procurement and inventory management practices. This study presents a novel UML model designed to streamline procurement and inventory management processes. The model aims to bridge the gap between conventional and digital construction practices. By integrating centralized control with decentralized decision-making, the model offers a dynamic solution for managing real-time tracking, procurement autonomy, and operational efficiency across multiple projects. Key features include the use of use-case, activity, class, and sequence diagrams to model the material flow, procurement lifecycle, and data-driven decision-making processes. This work is a significant step towards enabling the practical application of Construction 4.0 principles. In addition it sets a new standard in the field, providing a scalable and adaptable solution ready for empirical validation in future case studies.
引用
收藏
页码:166988 / 167009
页数:22
相关论文
共 36 条
  • [1] Fuzzy procurement selection model for construction projects
    Chan, Caroline T. W.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (06) : 611 - 618
  • [2] Enhancing value for money in public procurement of Northern Ireland construction projects
    McArdle, Gary
    Gunning, Joseph Gerard
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2018, 171 (05) : 207 - 219
  • [3] Hybrid procurement model for the construction of library literature and information resource procurement
    Zhang, Chuanyu
    Wang, Changsheng
    SYSTEMS AND SOFT COMPUTING, 2024, 6
  • [4] Toward a cleaner project procurement: Evaluation of construction projects' vulnerability to corruption in developing countries
    Owusu, Emmanuel Kingsford
    Chan, Albert P. C.
    Ameyaw, Ernest
    JOURNAL OF CLEANER PRODUCTION, 2019, 216 : 394 - 407
  • [5] A conceptual hybrid project management model for construction projects
    Lalmi, Abdallah
    Fernandes, Gabriela
    Souad, Sassi Boudemagh
    INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES 2020 (CENTERIS/PROJMAN/HCIST 2020), 2021, 181 : 921 - 930
  • [6] Buildability-led procurement: a new model for future construction projects delivery
    Osuizugbo, Innocent Chigozie
    CONSTRUCTION INNOVATION-ENGLAND, 2025,
  • [7] Enhancing Trust-Based Interface Management in International Engineering-Procurement-Construction Projects
    Shen, Wenxin
    Tang, Wenzhe
    Wang, Shuli
    Duffield, Colin F.
    Hui, Felix Kin Peng
    You, Richun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (09)
  • [8] A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user's perspective
    Aldhaheri, Mohamed
    Bakchan, Amal
    Sandhu, Maqsood Ahmad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (09) : 1226 - 1252
  • [9] A HYBRID MODEL FOR SELECTING LOCATION OF MOBILE CRANES IN BRIDGE CONSTRUCTION PROJECTS
    Marzouk, Mohamed
    Hisham, Mohamed
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2013, 8 (03): : 184 - 189
  • [10] Resource scheduling of construction projects using a hybrid genetic algorithm model
    Senouci, AB
    Naji, KK
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 205 - 209