Fuzzy procurement selection model for construction projects

被引:54
|
作者
Chan, Caroline T. W. [1 ]
机构
[1] City Univ Hong Kong, Div Bldg Sci & Technol, Hong Kong, Hong Kong, Peoples R China
关键词
Procurement; selection criteria; fuzzy logic;
D O I
10.1080/01446190701209933
中图分类号
F [经济];
学科分类号
02 ;
摘要
Recent developments in procurement selection systems are reviewed and this reveals contradiction and conflict with previous work. A mathematical rank model called fuzzy procurement selection model (FPSM) is proposed to adapt to local circumstances. FPSM can be modified according to local conditions or requirements and the modification methods are well documented in previous work. The proposed model overcomes the continual arguments on establishing a set of universal criteria on procurement selection systems and provides a useful tool to cope with different project/client's requirements.
引用
收藏
页码:611 / 618
页数:8
相关论文
共 50 条
  • [1] Fuzzy model for Libyan construction projects delivery system selection
    Youssef, Medhat
    Mohamed, Mohamed Saad Eldin
    Balah, Abdelraoff Ali Shokri
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (06) : 643 - 650
  • [2] Fuzzy MCDM Model for Risk Factor Selection in Construction Projects
    Rezakhani, Pejman
    ENGINEERING JOURNAL-THAILAND, 2012, 16 (05): : 79 - 93
  • [3] FUZZY MCDM MODEL FOR RISK FACTOR SELECTION IN CONSTRUCTION PROJECTS
    Rezakhani, Pejman
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2012, 3 (02): : 11 - 24
  • [4] Application of Delphi method in selection of procurement systems for construction projects
    Chan, A.P.C.
    Yung, E.H.K.
    Lam, P.T.I.
    Tam, C.M.
    Cheung, S.O.
    Construction Management and Economics, 2001, 19 (07) : 699 - 718
  • [5] The selection procedure of the projects construction, based on fuzzy logic
    Blaga, Florin
    Prada, Marcela
    Bungau, Constantin
    Stanasel, Iulian
    PROCEEDINGS OF THE 2ND REVIEW OF MANAGEMENT AND ECONOMIC ENGINEERING MANAGEMENT CONFERENCE: MANAGEMENT OF CRISIS OR CRISIS OF MANAGEMENT?, 2011, : 27 - 35
  • [6] Pretendering Decision Model for Contractor Selection of Public Procurement Projects
    Yu, Wen-Der
    Chang, Hsien-Kuan
    Hsu, Yuan-Yu
    Cheng, Shao-Tsai
    Wang, Kwo-Wuu
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (11)
  • [7] A SELECTION FUZZY MODEL INVOLVING ASSETS AND PROJECTS
    Badescu, Adrian Victor
    Cristea, Radu Nicolae
    Boldeanu, Dana-Maria
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ACCOUNTING AND MANAGEMENT INFORMATION SYSTEMS (AMIS 2011), 6TH EDITION, 2011, : 334 - 346
  • [8] Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
    Taylan, Osman
    Bafail, Abdallah O.
    Abdulaal, Reda M. S.
    Kabli, Mohammed R.
    APPLIED SOFT COMPUTING, 2014, 17 : 105 - 116
  • [9] Procurement of construction projects in local government
    Wamuziri, S
    Seywright, A
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 2005, 158 (02) : 145 - 152
  • [10] Social procurement in UK construction projects
    Loosemore, Martin
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (02) : 133 - 144