共 50 条
- [33] RAPID DEPLOYMENT SYSTEM FOR TANKER LOADING/OFFLOADING. Ocean industry, 1986, 21 (11): : 34 - 36
- [35] Compositional modification of crude oil during oil recovery Yangming, Z. (zyming@zju.edu.cn), 1600, Elsevier (38): : 1 - 2
- [36] Pressure swing adsorption for VOC recovery at gasoline loading terminals ENVIRONMENTAL PROGRESS, 1997, 16 (01): : 16 - 19
- [37] ANALYSIS OF YIELDING AND BUCKLING STRENGTH OF A MINIMAL BALLAST WATER CRUDE OIL TANKER PROCEEDINGS OF THE ASME 37TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2018, VOL 3, 2018,
- [38] The BP oil tanker structural monitoring system MARINE TECHNOLOGY AND SNAME NEWS, 1995, 32 (04): : 277 - 296
- [39] Continuous-time scheduling of tanker lightering in crude oil supply chain PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 547 - 552