Time-dependent prediction of effort needed for engineering changes

被引:0
|
作者
Kratzer M.J. [1 ]
Buchner C.
Kübler P. [3 ]
Burkert T.
Szost B. [2 ]
Bauernhansl T. [4 ]
机构
[1] Doktorand des IFF der Universität, Stuttgart
[2] BMW Group, Mittenheimer Str. 64, Oberschleißheim
[3] Fraunhofer-Institut für Produktionstechnik und Automatisierung IPA, Nobelstr. 12, Stuttgart
[4] Institut für industrielle Fertigung und Fabrikbetrieb, IFF Universität Stuttgart und Fraunhofer IPA, Nobelstr. 12, Stuttgart
来源
WT Werkstattstechnik | 2021年 / 111卷 / 05期
关键词
D O I
10.37544/1436-4980-2021-05-63
中图分类号
学科分类号
摘要
This paper presents an approach for predicting change efforts for planning the production of a component under development. The change effort is characterized by the duration of implementation and the respective costs. Unlike existing methods for change impact analyses, this method enables an automated change impact prediction at any point in time within the product development process, since change impact differs with temporal distance to the start of production. The method was developed for the automotive industry and delivers a valid basis for increasing flexibility with a view to production system changes. © 2021, VDI Fachmedien GmBbH & Co.. All rights reserved.
引用
收藏
页码:329 / 335
页数:6
相关论文
共 50 条