Stability Control of Overburden and Coal Pillar in the Gob-Side Entry Under Dynamic Pressure

被引:0
|
作者
Wang, Meng [1 ,3 ]
Xu, Yalong [1 ]
Xu, Qingyun [4 ]
Shan, Chengfang [2 ]
Li, Zhenhua [1 ,3 ]
Nan, Hua [1 ,3 ]
Li, Yafeng [2 ]
Liu, Honglin [5 ]
Chu, Tingxiang [6 ]
机构
[1] School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo, China
[2] Kuqa County Yushuling Coal Mine Co. LTD, Aksu Prefecture, China
[3] State Collaborative Innovation Center of Coal Work Safety and Clean-efficiency Utilization, Jiaozuo, China
[4] College of Coal Engineering, Datong University, Shanxi, China
[5] School of Geology and Mining Engineering, Xinjiang University, Urumchi, China
[6] School of Mine Safety, North China Institute of Science & Technology, Langfang, China
来源
SSRN | 2022年
关键词
Compilation and indexing terms; Copyright 2024 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
Anchor cables - Coal - Coal mines - Concrete construction - Grouting - Mine roof control - Mortar - Reinforcement - Roofs - Room and pillar mining - Structural design
引用
收藏
相关论文
共 50 条
  • [41] Research on Coupling Control Technology of Constant Resistance in Gob-side Entry Under Mined Gob of Recent Coal Seam Group
    Yong Zhang
    Xing Xia
    Xiao-ming Sun
    Peng Song
    Jian Wang
    Shi-jie Sun
    Chen Chen
    Geotechnical and Geological Engineering, 2020, 38 : 4685 - 4699
  • [42] Research on Coupling Control Technology of Constant Resistance in Gob-side Entry Under Mined Gob of Recent Coal Seam Group
    Zhang, Yong
    Xia, Xing
    Sun, Xiao-ming
    Song, Peng
    Wang, Jian
    Sun, Shi-jie
    Chen, Chen
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (05) : 4685 - 4699
  • [43] Dynamic distribution and prevention of spontaneous combustion of coal in gob-side entry retaining goaf
    Hu, Dongjie
    Li, Zongxiang
    PLOS ONE, 2022, 17 (05):
  • [44] Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study
    Luan, Hengjie
    Jiang, Yujing
    Zhou, Lujie
    Lin, Huili
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [45] Research on the Reasonable Coal Pillar Width and Surrounding Rock Supporting Optimization of Gob-Side Entry under Inclined Seam Condition
    Jiang, Li-li
    Yang, Zeng-qiang
    Li, Gang-wei
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [46] Characteristics of overburden failure and fracture development in gob of mining with gob-side entry formed by cutting roof
    Liu, Hongwei
    Zhao, Yangsheng
    Ren, Tingxiang
    Wang, Fei
    Li, Zhigang
    Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2022, 51 (01): : 77 - 89
  • [47] Study on small coal pillar in gob-side entry driving and control technology of the surrounding rock in a high-stress roadway
    Wang, Wen
    Wu, Yiheng
    Lu, Xiaowei
    Zhang, Guangjie
    FRONTIERS IN EARTH SCIENCE, 2023, 10
  • [48] Width optimization and application of narrow coal pillar in gob-side entry driven in thick coal seam in Luzigou Mine
    Sun L.
    Ding B.
    Li W.
    Chen Z.
    Shang D.
    Zhang Y.
    Song J.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2023, 40 (06): : 1151 - 1160
  • [49] Failure mechanism and control of deep gob-side entry
    Meng Wang
    Jianbiao Bai
    Wenfeng Li
    Xiangyu Wang
    Shenggen Cao
    Arabian Journal of Geosciences, 2015, 8 : 9117 - 9131
  • [50] Control Techniques for Gob-Side Entry Driving in an Extra-Thick Coal Seam with the Influence of Upper Residual Coal Pillar: A Case Study
    Xie, Shengrong
    Guo, Fangfang
    Wu, Yiyi
    ENERGIES, 2022, 15 (10)