Risk estimation of short-term power generation operation of cascade reservoirs based on Vine Copula/

被引:0
|
作者
Li, Jiqing [1 ]
Xie, Yutao [1 ]
Sun, Fengling [2 ]
机构
[1] School of Water Resources and Hydropower Engineering, North China Electric Power University, Beijing,102206, China
[2] Xiaowan Hydropower Plant of Huaneng Lancang River Hydropower Co., Ltd., Dali,675702, China
关键词
Errors - Forecasting - Risk perception - Runoff;
D O I
10.3880/j.issn.1004-6933.2024.04.003
中图分类号
学科分类号
摘要
Based on Vine Copula, which can accurately describe the correlation between high-dimensional variables, and considering the spatial correlation of short-term runoff forecasting errors, a risk estimation model for short-term power generation scheduling of cascade reservoirs was constructed. The model was applied to the Xiluodu, Xiangjiaba, and Three Gorges reservoirs in the upper reaches of the Yangtze River, and the short-term power generation scheduling risks of single reservoirs and cascade reservoirs caused by runoff forecasting errors were analyzed. The results show that the joint distribution based on C-vine Copula can better describe the error characteristics of daily runoff forecasting at Pingshan Station, Zhutuo Station, Cuntan Station, and Wulong Station. As the adjustable safety range of the reservoir increases, the risk rates of insufficient power generation and water abandonment in a single reservoir decrease, and the risk rate of insufficient power generation, joint risk rate of water abandonment, and co-occurrence risk rate of cascade reservoirs decrease. That is to say, the larger the regulating capacity of the reservoir, the smaller the risk it bears. © 2024 Editorial Board of Water Resources Protection. All rights reserved.
引用
收藏
页码:17 / 26
相关论文
共 50 条
  • [31] Considering water propagation impact in short-term optimal operation of cascade reservoirs using Nested Progressive Optimality Algorithm
    Ji, Changming
    Liu, Yuan
    Wang, Yi
    Zhang, Yanke
    Xie, Yutao
    JOURNAL OF HYDROLOGY, 2021, 602
  • [32] Cascade reservoirs' joint optimal operation of power generation based on improved electro-search algorithm
    Wang L.-P.
    Li N.-N.
    Yan X.-R.
    Zhang Y.-K.
    Ji C.-M.
    Kongzhi yu Juece/Control and Decision, 2020, 35 (08): : 1916 - 1922
  • [33] SHORT-TERM RELIABILITY OF POWER SYSTEM GENERATION
    SURANA, SL
    BRAMELLER, A
    PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1974, 121 (05): : 348 - 354
  • [34] Short-term forecasting of photovoltaic power generation
    Korab, Roman
    Kandzia, Tomasz
    Naczynski, Tomasz
    PRZEGLAD ELEKTROTECHNICZNY, 2023, 99 (09): : 31 - 36
  • [35] Short-term power forecasting for photovoltaic generation based on psoesn model
    Wen R.
    Tan L.
    Li W.
    Li L.
    1600, E-Flow PDF Chinese Institute of Electrical Engineering (24): : 21 - 30
  • [36] A Short-Term Photovoltaic Power Generation Forecast Method Based on LSTM
    Li, Yang
    Ye, Feng
    Liu, Zihao
    Wang, Zhijian
    Mao, Yupeng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [37] Short-term Operation Method and Hydraulic Calculation of Three Gorges Cascade
    Ai Xueshan
    Chen Senlin
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [38] Short-term scheduling of cascade reservoirs using an immune algorithm-based particle swarm optimization
    Fu, Xiang
    Li, Anqiang
    Wang, Liping
    Ji, Changming
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2011, 62 (06) : 2463 - 2471
  • [39] Short-Term Operation Flexibility in Modular Power to Hydrogen Based Ammonia Industries
    Firdous, Aaquib
    Barala, Chandra Prakash
    Mathuria, Parul
    Bhakar, Rohit
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2025, 16 (01) : 601 - 612
  • [40] Cooperation Search Algorithm for Power Generation Production Operation Optimization of Cascade Hydropower Reservoirs
    Wen-jing Niu
    Zhong-kai Feng
    Yu-rong Li
    Shuai Liu
    Water Resources Management, 2021, 35 : 2465 - 2485