Management Model Using Standardized Contracts and BIM Tools for the Optimization of PPP Projects in Peru

被引:1
|
作者
Villanueva, Filiberto Rody Montoya [1 ]
Brioso, Xavier [2 ]
机构
[1] Catholic Univ Santa Maria, Profess Sch Civil Engn, Arequipa 04013, Peru
[2] Pontifical Catholic Univ Peru, Dept Engn, GETEC Res Grp, Ave Univ 1801, Lima 15088, Peru
关键词
contract management; public-private partnerships; building information modeling; NEC4; EC; management model;
D O I
10.3390/buildings14103210
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Public-private partnerships (PPPs) are contractual schemes that have relative success in Latin America due to their configuration, where the spirit of the contract lies in an appropriate distribution of risks. This is both the most important and fundamental aspect of this contractual scheme but also the most complex, as it is the main cause of contract modifications (addenda) in countries across the region. In this context, different concessionary contractual frameworks for PPPs on the national road network of Peru were evaluated, revealing common failure indicators that lead to contract modifications within the first six years of the concession. This study offers the development of a management model that includes the good practices of contractual management of NEC4 Option F and the application of BIM information management processes, optimizing the management of infrastructure through emerging technologies of information management supported by agile contractual schemes.
引用
收藏
页数:29
相关论文
共 50 条
  • [31] Framework and tools for project management by using a flow model of activities
    Kaneta, T
    Furusaka, S
    Yoshida, R
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 123 - 130
  • [32] Reliability-Constrained Structural Design Optimization Using Visual Programming in Building Information Modeling (BIM) Projects
    Yavan, Feyzullah
    Maalek, Reza
    APPLIED SCIENCES-BASEL, 2025, 15 (03):
  • [33] A risk management model of apartment development projects using system dynamics
    Rachmawati, Titi Sari Nurul
    Kim, Sunkuk
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2023, 22 (03) : 1492 - 1506
  • [34] Modeling for insight using Tools for Energy Model Optimization and Analysis (Temoa)
    Hunter, Kevin
    Sreepathi, Sarat
    DeCarolis, Joseph F.
    ENERGY ECONOMICS, 2013, 40 : 339 - 349
  • [35] Evaluating Award-Winning BIM Projects Using the National Building Information Model Standard Capability Maturity Model
    McCuen, Tamera L.
    Suermann, Patrick C.
    Krogulecki, Matthew J.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (02) : 224 - 230
  • [36] Waiting Times Optimization in Medical Services using Management Systems Specific Tools
    Voinescu, Leonardo
    QUALITY-ACCESS TO SUCCESS, 2015, 16 (147): : 59 - 61
  • [37] d Investigatins the impact of using PMIS in resource management on cost of projects as a conceptual model in construction projects
    Mosavi, Seyed Karim
    Hosseini, Azim
    Vosoughifar, Hamid Reza
    Barandoust, Rambood
    Mohammadi, Ghodratollah
    NEXO REVISTA CIENTIFICA, 2022, 35 (02): : 601 - 610
  • [38] Time and finance optimization model for multiple construction projects using genetic algorithm
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    JOURNAL OF THE MECHANICAL BEHAVIOR OF MATERIALS, 2022, 31 (01) : 267 - 281
  • [39] Optimization model in the management of inventories using genetic algorithms
    Valencia Nino, Cesar Hernando
    Caceres Quijano, Silvia Nathalia
    REVISTA ITECKNE, 2011, 8 (02): : 156 - 162
  • [40] BUSINESS PERFORMANCE MANAGEMENT USING MODEL FOR PROFIT OPTIMIZATION
    Bolfek, Berislav
    Loncaric, Biljana
    INTERDISCIPLINARY MANAGEMENT RESEARCH VI, 2010, 6 : 28 - 36