Management Model Using Standardized Contracts and BIM Tools for the Optimization of PPP Projects in Peru

被引:1
|
作者
Villanueva, Filiberto Rody Montoya [1 ]
Brioso, Xavier [2 ]
机构
[1] Catholic Univ Santa Maria, Profess Sch Civil Engn, Arequipa 04013, Peru
[2] Pontifical Catholic Univ Peru, Dept Engn, GETEC Res Grp, Ave Univ 1801, Lima 15088, Peru
关键词
contract management; public-private partnerships; building information modeling; NEC4; EC; management model;
D O I
10.3390/buildings14103210
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Public-private partnerships (PPPs) are contractual schemes that have relative success in Latin America due to their configuration, where the spirit of the contract lies in an appropriate distribution of risks. This is both the most important and fundamental aspect of this contractual scheme but also the most complex, as it is the main cause of contract modifications (addenda) in countries across the region. In this context, different concessionary contractual frameworks for PPPs on the national road network of Peru were evaluated, revealing common failure indicators that lead to contract modifications within the first six years of the concession. This study offers the development of a management model that includes the good practices of contractual management of NEC4 Option F and the application of BIM information management processes, optimizing the management of infrastructure through emerging technologies of information management supported by agile contractual schemes.
引用
收藏
页数:29
相关论文
共 50 条
  • [1] BIM Management as a resource optimization system in building projects.
    Alexandra, Quinones
    Maylett, Uzcategui
    Dixon, Mendez
    CIENCIA E INGENIERIA, 2023, 44 (01): : 43 - 50
  • [2] A Framework for Collaboration Management of BIM Model Creation in Architectural Projects
    Lin, Yu-Cheng
    Yang, Hui-Hsuan
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2018, 17 (01) : 39 - 46
  • [3] A DYNAMIC SIMULATION MODEL FOR FINANCING STRATEGY MANAGEMENT OF INFRASTRUCTURE PPP PROJECTS
    Zhang, Yuqing
    Hou, Wenhua
    Qian, Yan
    INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2020, 24 (06) : 441 - 455
  • [4] Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects
    Chen, Canjun
    Lv, Lelin
    Wang, Zhuofu
    Qiao, Ran
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (09) : 3876 - 3894
  • [5] Optimal BIM staffing in construction projects using a queueing model
    Ham, Namhyuk
    Moon, Sungkon
    Kim, Ju-Hyung
    Kim, Jae-Jun
    AUTOMATION IN CONSTRUCTION, 2020, 113
  • [6] Studies on Risk Management of the Urban Infrastructure Projects Based on the PPP Financing Model
    Chen, Hanli
    Ma, ChaoQun
    Liu, Bo
    Qin, Tao
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 1614 - +
  • [7] A conceptual model for adoption of BIM in construction projects: ADKAR as an integrative model of change management
    Jaaron, Ayham A. M.
    Hijazi, Ihab Hamzi
    Musleh, Khader Issa Yousef
    TECHNOLOGY ANALYSIS & STRATEGIC MANAGEMENT, 2022, 34 (06) : 655 - 667
  • [8] Using Methods and IT Tools Innovatively for the Management of International IS Development Projects
    Katainen, Tommi
    Nahar, Nazmun
    2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1851 - 1863
  • [9] Research on the Innovation of Government Investment Projects Management Model under BIM Situation
    Jia, Chong
    Wang, Zhihong
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 224 - 231
  • [10] Optimization of the waste management for construction projects using simulation
    Chandrakanthi, M
    Hettiaratchi, P
    Prado, B
    Ruwanpura, JY
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1771 - 1777