Graphical revamping of a delayed coker unit: A case study from an Egyptian refinery

被引:0
|
作者
Alazmi, Radhi H. [1 ]
Gadalla, Mamdouh [2 ,3 ]
Wang, Bohong [4 ]
Shahin, Mohamed [5 ]
Elazab, Hany A. [6 ]
Majozi, Thokozani [3 ]
Ashour, Fatma [5 ]
机构
[1] PAAET, Coll Technol Studies, Chem Engn Dept, Kuwait, Kuwait
[2] Port Said Univ, Fac Engn, Chem Engn Dept, Port Said, Egypt
[3] Univ Witwatersrand, Fac Engn & Built Environm, Johannesburg, South Africa
[4] Zhejiang Ocean Univ, Natl & Local Joint Engn Res Ctr Harbor Oil & Gas S, Zhejiang Key Lab Petrochem Environm Pollut Control, 1 Haida South Rd, Zhoushan 316022, Peoples R China
[5] Cairo Univ, Fac Engn, Chem Engn Dept, Giza, Egypt
[6] Missouri Univ Sci & Technol, Chem & Biochem Engn Dept, Rolla, MO 65409 USA
关键词
Revamping; Energy saving; Delayed coker; HEN; Bottom of barrel; DECANT-OIL; ENERGY; PINCH;
D O I
10.1016/j.tsep.2024.102913
中图分类号
O414.1 [热力学];
学科分类号
摘要
Delayed coker units are used to upgrade the heavy feedstocks (barrel bottom) to valued low-carbon liquid fuels (light fractions) and coke, but they are considered one of the most energy-intensive processes in refining industries. It is highly recommended to optimize the energy efficiency of such units to reduce CO2 atmospheric release to mitigate green-house-gas (GHG) implications. The objective of this research is to maximize the energy efficiency of delayed coker units and reduce electricity consumption in particular and CO2 emissions accordingly. In this case study, a Pinch Technology-based method is developed to redesign a network of a delayed coker located in some modern refineries in Egypt to improve its energy efficiency, enhance profit and reduce carbon emissions. The new revamping method relies on implementing graphics and integrating Pinch insights. The case study contains twenty-nine exchanger units, including about thirty-six process streams. The coker unit under study is relatively new, and processes vacuum residue into LPG, naphtha, light and heavy gas oil, and coke. The outcome of this case study resulted in savings of 4.72 MW of hot energy and 4.83 MW equivalent of electricity savings, and reduced energy costs of 3,390,388 US $ per year with total capital investment of 321,819 US $. The corresponding annual cut in CO2 emissions is 32,184 t, leading to better environment with respect to climate change. The relative energy savings and carbon emissions cut are 11 % and 13 %, respectively compared with the current operation.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Physical and geohydrological containment for a former lead refinery: from field and laboratory tests to detailed design - A case study
    Campion, A.
    Sacilotto, L.
    Capelli, M.
    Ceccarini, R.
    Baldi, D.
    CONSOIL 2008: THEME E - REMEDIATION CONCEPTS & TECHNOLOGIES, VOLS 1-3, 2008, : 934 - 943
  • [42] Establishing the eradication unit of Molara Island: a case of study from Sardinia, Italy
    Lapo Ragionieri
    Giulia Cutuli
    Paolo Sposimo
    Giovanna Spano
    Augusto Navone
    Dario Capizzi
    Nicola Baccetti
    Marco Vannini
    Sara Fratini
    Biological Invasions, 2013, 15 : 2731 - 2742
  • [43] Establishing the eradication unit of Molara Island: a case of study from Sardinia, Italy
    Ragionieri, Lapo
    Cutuli, Giulia
    Sposimo, Paolo
    Spano, Giovanna
    Navone, Augusto
    Capizzi, Dario
    Baccetti, Nicola
    Vannini, Marco
    Fratini, Sara
    BIOLOGICAL INVASIONS, 2013, 15 (12) : 2731 - 2742
  • [44] A retrospective review on benzodiazepine use: A case study from a chronic dispensary unit
    Singh, I.
    Oosthuizen, F.
    SAMJ SOUTH AFRICAN MEDICAL JOURNAL, 2019, 109 (02): : 127 - 132
  • [45] Multimethod and Interpersonal Assessment in Medical Settings: A Case Study from the Dermatology Unit
    Vari, Chiara
    Velotti, Patrizia
    Zavattini, Giulio Cesare
    Richetta, Antonio G.
    Calvieri, Stefano
    MEDITERRANEAN JOURNAL OF CLINICAL PSYCHOLOGY, 2013, 1 (03):
  • [46] WATER CONTACT AND SCHISTOSOMA-HAEMATOBIUM INFECTION - A CASE-STUDY FROM AN UPPER EGYPTIAN VILLAGE
    KLOOS, H
    HIGASHI, GI
    SCHINSKI, VD
    MANSOUR, NS
    MURRELL, KD
    MILLER, FD
    INTERNATIONAL JOURNAL OF EPIDEMIOLOGY, 1990, 19 (03) : 749 - 758
  • [47] Risk factors for the delayed discharge from anesthesia intensive care unit: a single-center retrospective study
    Qian, Yue
    Hao, Jing
    Zhu, Wei
    Yang, Yan
    Zhang, Zhuan-yun
    Zhou, Lu-yang
    Gu, Xiao-ping
    Ma, Zheng-liang
    Sun, Yu-e
    BMC ANESTHESIOLOGY, 2025, 25 (01):
  • [48] OPTIMIZING ENERGY-PRODUCTION FROM AGROWASTES - A CASE-STUDY FOR THE FERMENTATION OF EGYPTIAN BEET MOLASSES
    TAYEB, AM
    ASFOUR, HM
    ALY, IH
    MOSTAFA, NA
    ENERGY CONVERSION AND MANAGEMENT, 1991, 32 (05) : 505 - 513
  • [49] Implementation of Delayed Cord Clamping in public health facilities: a case study from India
    Chowdhury, Archana
    Neogi, Sutapa Bandyopadhyay
    Prakash, Ved
    Patel, Nilam
    Pawar, Kunal
    Koparde, Vinay Kumar
    Shukla, Anupriya
    Karmakar, Sangeeta
    Parambath, Smitha Chekanath
    Rowe, Sarah
    Martinez, Homero
    BMC PREGNANCY AND CHILDBIRTH, 2022, 22 (01)
  • [50] Factors related to delayed intensive care unit admission from emergency department-A retrospective cohort study
    Aitavaara-Anttila, Mia
    Liisanantti, Janne H.
    Raatiniemi, Lasse
    Ohtonen, Pasi
    Ala-Kokko, Tero
    ACTA ANAESTHESIOLOGICA SCANDINAVICA, 2019, 63 (07) : 939 - 946