Graphical revamping of a delayed coker unit: A case study from an Egyptian refinery

被引:0
|
作者
Alazmi, Radhi H. [1 ]
Gadalla, Mamdouh [2 ,3 ]
Wang, Bohong [4 ]
Shahin, Mohamed [5 ]
Elazab, Hany A. [6 ]
Majozi, Thokozani [3 ]
Ashour, Fatma [5 ]
机构
[1] PAAET, Coll Technol Studies, Chem Engn Dept, Kuwait, Kuwait
[2] Port Said Univ, Fac Engn, Chem Engn Dept, Port Said, Egypt
[3] Univ Witwatersrand, Fac Engn & Built Environm, Johannesburg, South Africa
[4] Zhejiang Ocean Univ, Natl & Local Joint Engn Res Ctr Harbor Oil & Gas S, Zhejiang Key Lab Petrochem Environm Pollut Control, 1 Haida South Rd, Zhoushan 316022, Peoples R China
[5] Cairo Univ, Fac Engn, Chem Engn Dept, Giza, Egypt
[6] Missouri Univ Sci & Technol, Chem & Biochem Engn Dept, Rolla, MO 65409 USA
关键词
Revamping; Energy saving; Delayed coker; HEN; Bottom of barrel; DECANT-OIL; ENERGY; PINCH;
D O I
10.1016/j.tsep.2024.102913
中图分类号
O414.1 [热力学];
学科分类号
摘要
Delayed coker units are used to upgrade the heavy feedstocks (barrel bottom) to valued low-carbon liquid fuels (light fractions) and coke, but they are considered one of the most energy-intensive processes in refining industries. It is highly recommended to optimize the energy efficiency of such units to reduce CO2 atmospheric release to mitigate green-house-gas (GHG) implications. The objective of this research is to maximize the energy efficiency of delayed coker units and reduce electricity consumption in particular and CO2 emissions accordingly. In this case study, a Pinch Technology-based method is developed to redesign a network of a delayed coker located in some modern refineries in Egypt to improve its energy efficiency, enhance profit and reduce carbon emissions. The new revamping method relies on implementing graphics and integrating Pinch insights. The case study contains twenty-nine exchanger units, including about thirty-six process streams. The coker unit under study is relatively new, and processes vacuum residue into LPG, naphtha, light and heavy gas oil, and coke. The outcome of this case study resulted in savings of 4.72 MW of hot energy and 4.83 MW equivalent of electricity savings, and reduced energy costs of 3,390,388 US $ per year with total capital investment of 321,819 US $. The corresponding annual cut in CO2 emissions is 32,184 t, leading to better environment with respect to climate change. The relative energy savings and carbon emissions cut are 11 % and 13 %, respectively compared with the current operation.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Maximizing Energy Efficiency in Petroleum Refining: Case Study-Delayed Coker Unit in an Egyptian Refinery
    Shahin, Mohamed
    Elazab, Hany A.
    Gadalla, Mamdouh
    Majozi, Thokozani
    Ashour, Fatma
    ENGINEERING SOLUTIONS TOWARD SUSTAINABLE DEVELOPMENT, ESSD 2023, 2024, : 837 - 849
  • [2] Exergy Study of Sour Water Stripper Unit of Delayed Coker Unit in a Refinery plant: A Real Start-Up Plant
    Ibrahim, Ahmed Y.
    Ashour, Fatma H.
    Gadalla, Mamdouh A.
    EGYPTIAN JOURNAL OF CHEMISTRY, 2021, 64 (09): : 4821 - +
  • [3] Revamping of Heat Exchanger Network of an Egyptian Refinery Plant using New Temperature Driving Force (TDF) Graphical Technique
    Kamel, Dina A.
    Gadalla, Mamdouh A.
    Ashour, Fatma H.
    PRES2016: 19TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELING AND OPTIMIZATION FOR ENERGY SAVINGS AND POLLUTION REDUCTION, 2016, 52 : 337 - 342
  • [4] Disturbance Modelling based Benefit estimation from Advanced Process Control: Case study on Delayed Coker Unit
    Kedia, Vatsal
    Nallasivam, Ulaganathan
    Ambati, Seshagiri Rao
    2019 FIFTH INDIAN CONTROL CONFERENCE (ICC), 2019, : 207 - 212
  • [5] Revamping of an acid gas absorption unit: An industrial case study
    Kheirinik, Mahdi
    Rahmanian, Nejat
    Farsi, Mohammad
    Garmsiri, Mehdi
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2018, 55 : 534 - 541
  • [6] Systems availability enhancement methodology: A refinery unit case study
    Calixto, E.
    Safety and Reliability for Managing Risk, Vols 1-3, 2006, : 2469 - 2476
  • [7] Predictive modeling and optimization for an industrial Coker Complex Hydrotreating unit - development and a case study
    Sbaaei, Eslam S.
    Ahmed, Tamer S.
    FUEL, 2018, 212 : 61 - 76
  • [8] Corrosion in Propane Deasphalting Unit in a Lube Producing Refinery: A Case Study
    Ghosh, D.
    Chaudhuri, U. R.
    PETROLEUM SCIENCE AND TECHNOLOGY, 2009, 27 (11) : 1227 - 1232
  • [9] Energy and exergy analyses of a cogeneration unit in an oil refinery: a case study
    Ferreira, Luiz Fernando Rodrigues
    Gallo, Waldyr Luiz Ribeiro
    INTERNATIONAL JOURNAL OF EXERGY, 2022, 38 (02) : 176 - 201
  • [10] Study of the liquids derived from CO-COKING in a laboratory-scale delayed coker.
    Escallon, MM
    Mitchell, GD
    Schobert, HH
    Badger, MW
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2003, 225 : U857 - U857