共 50 条
- [41] Simulation speeds part setups, reduces downtime MANUFACTURING ENGINEERING, 2008, 140 (03): : 42 - +
- [44] CONSEQUENTIAL EQUIPMENT COSTS ASSOCIATED WITH LACK OF AVAILABILITY AND DOWNTIME JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04): : 656 - 669
- [46] SHORTENING PLANT DOWNTIME BY USE OF PROGRAMMABLE CONTROL EQUIPMENT ZEMENT-KALK-GIPS, 1978, 31 (08): : 408 - 412
- [48] FAILURE FREQUENCY AND DOWNTIME DURATION EFFECTS ON EQUIPMENT AVAILABILITY TRANSACTIONS OF THE ASAE, 1985, 28 (04): : 999 - 1002
- [49] RANDO SPINNING EQUIPMENT CLEANER IMPROVES CLEANING, REDUCES MICRO-DUST TEXTILE INDUSTRIES, 1984, 148 (10): : 68 - 68