共 50 条
- [3] COMPUTERIZED PM REDUCES UNSCHEDULED EQUIPMENT DOWNTIME AT DEUTZ-ALLIS. Practical lubrication & maintenance, 1987, 10 (04): : 27 - 28
- [9] CONSTRUCTION EQUIPMENT DOWNTIME COSTS JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1980, 106 (04): : 604 - 607