Research on scenery design technique for cable-stayed bridge

被引:0
|
作者
Zhang, Changqing [1 ]
Wan, Shui [1 ]
Zhang, Li [1 ]
机构
[1] Transp. Sci. Res. Inst., Chongqing 400067, China
关键词
Computer aided design - Computer software - Three dimensional computer graphics;
D O I
暂无
中图分类号
学科分类号
摘要
The research to generate the stereoscopic scenery of large span bridge is conducted. The scenery design for the cable-stayed bridge is implemented. Study is focused on the three-dimensional model of the cable-stayed bridge by means of CAD and on the data reconstructure method. Criterion of parameters selecting of three-dimensional model of the bridge scenery is determined. A diminutive CAD software of bridge scenery is introduced. Stereoscopic scenery of the cable-stayed bridge is designed with the software.
引用
收藏
页码:316 / 320
相关论文
共 50 条
  • [31] Determination of cable tension on cable-stayed bridge
    Yao, Wen-Bin
    Zhang, Wei
    Shao, Qian-Jun
    Chinese Journal of Sensors and Actuators, 2004, 17 (03) : 484 - 487
  • [32] TENTATIVE RECOMMENDATIONS FOR CABLE-STAYED BRIDGE STRUCTURES AND COMMENTARY ON TENTATIVE RECOMMENDATIONS FOR CABLE-STAYED BRIDGE STRUCTURES
    ISYUMOV, N
    TSCHANZ, T
    JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1978, 104 (03): : 611 - 613
  • [33] CONVERSION OF A SUSPENSION BRIDGE INTO A CABLE-STAYED BRIDGE
    BUCKLAND, PG
    MORGENSTERN, BD
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1991, 18 (02) : 273 - 281
  • [34] Research on primary resonance of cables in curved cable-stayed bridge
    College of Civil Engineering, Hunan University, Changsha 410082, China
    不详
    Gongcheng Lixue/Engineering Mechanics, 2008, 25 (11): : 86 - 91
  • [35] MONTREAL BOASTS CABLE-STAYED BRIDGE
    DEMERS, JG
    SIMONSEN, OF
    CIVIL ENGINEERING, 1971, 41 (08): : 59 - &
  • [36] Construction of the hybrid cable-stayed bridge
    Kim, D. G.
    Kwon, H. C.
    Lee, K. J.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 3328 - 3333
  • [37] DYNAMIC BEHAVIOR OF A CABLE-STAYED BRIDGE
    FLEMING, JF
    EGESELI, EA
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1980, 8 (01): : 1 - 16
  • [38] Missouri Cable-Stayed Bridge Opens
    Goodwin, April
    Better Roads, 2004, 74 (02): : 94 - 97
  • [39] OPERATION AND MAINTENANCE OF CABLE-STAYED BRIDGE
    Tian Chunyan
    Yang Shengchao
    Zhang Na
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 1059 - +
  • [40] CABLE-STAYED BRIDGE CROSSES THE MISSISSIPPI
    不详
    WELDING DESIGN & FABRICATION, 1984, 57 (06): : 67 - 70