共 50 条
- [42] The Basic Problems about Fully-Mechanized Top-coal Caving System ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 518 - +
- [43] Formation mechanism of overburden bed separation in fully mechanized top-coal caving Meitan Xuebao/Journal of the China Coal Society, 2016, 41 : 342 - 349
- [45] Methods for calculating specific air-leakage in loose coal of fully mechanized longwall top-coal caving face Meitan Xuebao/Journal of China Coal Society, 1999, 24 (05): : 502 - 506
- [47] A study on mechanical principle of floor heave of roadway driving along next goaf in coal face with fully mechanized top-coal caving ROCK MECHANICS IN THE NATIONAL INTEREST, VOLS 1 AND 2, 2001, : 351 - 354
- [48] Application of microseismic monitoring technology on fully mechanized top-coal caving face of extra-thick coal seam ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 17 - 20
- [50] Analyzing on air-leakage condition of gate in fully-mechanized long-wall top-coal caving mining face Meitan Xuebao/Journal of China Coal Society, 2000, 25 (06): : 619 - 623