Solution algorithms for the project selection and scheduling problem with resource constraints and time dependent returns

被引:0
|
作者
Ghahremani, Pezhman [1 ]
Naderi, Bahman [2 ]
机构
[1] Department of Industrial Engineering, Qazvin Branch, Islamic Azad University, Pazhohesh Blv., Qazvin, Iran
[2] Department of Industrial Engineering, Faculty of Engineering, University of Kharazmi, Hesarak St., Karaj, Iran
关键词
Constructive heuristic - Iterated greedy algorithm - Mixed integer programming - Model and algorithms - Project selection - Resource Constraint - Solution algorithms - Time dependent;
D O I
10.1504/IJISE.2015.068200
中图分类号
学科分类号
摘要
This paper considers the problem of resource constrained project selection and scheduling with a limited planning horizon and time-dependent return. The objective is to select a set of projects that maximise the present worth of profit. We first mathematically formulate the problem and compare the model with the adaptation of an available model for a similar problem. To solve the problem, we employ five novel metaheuristics based on genetic and iterated greedy algorithms. We propose a novel effective constructive heuristic to produce initial solution for the algorithm and a novel crossover operator. A comprehensive experiment is established with small and large sized instances to compare and evaluate the performance of the proposed model and algorithms. All the results show the effectiveness of the model and algorithms. Copyright © 2015 Inderscience Enterprises Ltd.
引用
收藏
页码:348 / 363
相关论文
共 50 条
  • [21] Problem space search algorithms for resource-constrained project scheduling
    Kedar S. Naphade
    S. David Wu
    Robert H. Storer
    Annals of Operations Research, 1997, 70 : 307 - 326
  • [22] On the performance of bee algorithms for resource-constrained project scheduling problem
    Ziarati, Koorush
    Akbari, Reza
    Zeighami, Vahid
    APPLIED SOFT COMPUTING, 2011, 11 (04) : 3720 - 3733
  • [23] Problem space search algorithms for resource-constrained project scheduling
    Naphade, KS
    Wu, SD
    Storer, RH
    ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 307 - 326
  • [24] Bi-objective resource-constrained project scheduling problem with time-dependent resource costs
    Alcaraz, Javier
    Anton-Sanchez, Laura
    Saldanha-da-Gama, Francisco
    JOURNAL OF MANUFACTURING SYSTEMS, 2022, 63 : 506 - 523
  • [25] ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS
    Shih, Neng-Hui
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 494 - 500
  • [26] A fuzzy time-dependent project scheduling problem
    Huang, Wei
    Oh, Sung-Kwun
    Pedrycz, Witold
    INFORMATION SCIENCES, 2013, 246 : 100 - 114
  • [27] Project selection with discounted returns and multiple constraints
    Kyparisis, GJ
    Gupta, SK
    Ip, CM
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (01) : 87 - 96
  • [28] SIMPLE AND INTEGRATED HEURISTIC ALGORITHMS FOR SCHEDULING TASKS WITH TIME AND RESOURCE CONSTRAINTS
    ZHAO, W
    RAMAMRITHAM, K
    JOURNAL OF SYSTEMS AND SOFTWARE, 1987, 7 (03) : 195 - 205
  • [29] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [30] A hybrid project scheduling and material ordering problem: Modeling and solution algorithms
    Zoraghi, N.
    Shahsavar, A.
    Niaki, S. T. A.
    APPLIED SOFT COMPUTING, 2017, 58 : 700 - 713