Solution of resource saving problems in conditions of manufacture of a competitive product

被引:0
|
作者
Belyj, V.A.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:95 / 97
相关论文
共 50 条
  • [21] Conditions for through-process analysis of product surface in steel manufacture
    van den Berg, F. D.
    Denys, M. B.
    Duysters, S.
    Jonker, C. A. A.
    Kuiper, G. E. N.
    van Lieshout, P. T. M.
    Timmermans, M. P.
    Ploegaert, H. T.
    Thornton, S. G.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (9-10): : 988 - 994
  • [22] Conditions for through-process analysis of product surface in steel manufacture
    Van Den Burgh, FD
    Duysters, S
    Jonker, CAA
    Kuiper, GEN
    Van Lieshout, PTM
    Timmermans, MP
    Ploegaert, HT
    Denys, MB
    Thornton, SG
    ADVANCES IN E-ENGINEERING AND DIGITAL ENTERPRISE TECHNOLOGY-I, PROCEEDINGS, 2004, : 455 - 464
  • [23] Daylight saving time is a solution for which many forgot the problems
    Martin-Olalla, Jorge Maria
    Mira, Jorge
    JOURNAL OF CLINICAL SLEEP MEDICINE, 2024, 20 (05): : 833 - 833
  • [24] RESOURCE-SAVING TECHNOLOGIES OF CULTIVATION OF GRAIN IN THE CONDITIONS OF NOVGOROD REGION
    Kirkorova, L. A.
    Lipnitsky, T. V.
    Tiranova, L. V.
    Tiranov, A. B.
    INTERNATIONAL SCIENTIFIC AND PRACTICAL CONFERENCE CONTEMPORARY ISSUES OF ECONOMIC DEVELOPMENT OF RUSSIA: CHALLENGES AND OPPORTUNITIES, 2019, 59 : 445 - 455
  • [25] NEW DEVELOPMENTS IN TELETHERAPY - PROBLEMS IN MANUFACTURE OF FISSION-PRODUCT THERAPY SOURCES
    RUPP, AF
    NUCLEONICS, 1952, 10 (04): : 45 - 46
  • [26] A competitive heuristic solution technique for Resource-Constrained Project Scheduling
    Tormos, P
    Lova, A
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 65 - 81
  • [27] Resource configurations, product development capability, and competitive advantage: An empirical analysis of their evolution
    Saranga, Haritha
    George, Rejie
    Beine, Judith
    Arnold, Ulli
    JOURNAL OF BUSINESS RESEARCH, 2018, 85 : 32 - 50
  • [28] A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling
    Pilar Tormos
    Antonio Lova
    Annals of Operations Research, 2001, 102 : 65 - 81
  • [29] RIGOROUS SOLUTION OF THE COMPETITIVE ADVANTAGE PROBLEM - APPLICATION TO BIBLIOMETRIC PROBLEMS
    KANTOR, PB
    PROCEEDINGS OF THE AMERICAN SOCIETY FOR INFORMATION SCIENCE, 1981, 18 : 282 - 284
  • [30] Assessment of energy, resource saving, environmental, product and economic potential of farm animal products
    Ermolenko, B., V
    Prutskikh, S.
    THEORETICAL AND APPLIED ECOLOGY, 2024, (04): : 37 - 48