Assessment on safety and performance of super-high arch dam with asymmetric foundation and its reinforcement effect identification

被引:0
|
作者
Li, Yi [1 ]
Zhao, Erfeng [1 ,2 ,3 ]
Hu, Lingzhi [2 ]
Shao, Chenfei [1 ,3 ]
Dong, Zhihao [1 ,3 ]
Zhong, Qiaojun [1 ,3 ]
机构
[1] Hohai Univ, Natl Key Lab Water Disaster Prevent, Nanjing 210098, Peoples R China
[2] Yunnan Key Lab Water Conservancy & Hydropower Engn, Kunming 650000, Peoples R China
[3] Hohai Univ, Natl Engn Res Ctr Water Resources Efficient Utiliz, Nanjing 210098, Peoples R China
基金
中国国家自然科学基金;
关键词
Asymmetric foundation; Arch dam; Reinforcement effect; Deformation energy; Relationship model; CONCRETE DAMS; STABILITY; FAILURE; DEFORMATION; DESIGN;
D O I
10.1016/j.istruc.2024.107812
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Arch dams mainly rely on abutment on both banks to maintain stability. The asymmetry of foundation geology and topography is a critical issue that affects the safety and performance of arch dams. This work is a contribution to reveal the influence mechanism of asymmetric foundation on the safe of the super-high arch dam, and evaluate its reinforcement effect, through combining the comparative study method and the relationship model. Firstly, the performance evolution of three arch dams with different degrees of symmetry under normal and overload conditions is explored. The asymmetric foundation can cause asymmetric deformation and stress on the arch dam, which may cause damage in local areas, and affect the overall stability. Secondly, the reinforcement measures considered to improve the asymmetric foundation are evaluated. According to the overload failure process, a set of safety factors is proposed to evaluate the adaptability of the reinforced arch dam to the asymmetric foundation. Setting cushions and strengthening the foundation can effectively adapt the arch dam to the complex foundations. Finally, the relationship model is established to quantify the safety factor of the arch dam in real time. The identification and prediction of reinforcement effect of the Jinping I arch dam are fulfilled through the relationship model between safety and load.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Study on Mechanism of Crack on Upstream Surface of Super-high Arch Dam
    Guan, Junfeng
    Qing, Longbang
    Wang, Juan
    Bai, Weifeng
    Hu, Yu
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1325 - +
  • [22] Engineering Advice for Preventing Crack on the Upstream Surface of Super-high Arch Dam
    Guan, Junfeng
    Qing, Longbang
    Bai, Weifeng
    Wang, Juan
    Lin, Peng
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1320 - +
  • [23] Optimization study on super-high arch dam temperature control standard and measure
    Liu Youzhi
    Li Jintao
    Chen Wenfu
    Zhang Guoxin
    Tan Yaosheng
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [24] Simulation Feedback of Temperature Field of Super-High Arch Dam during Operation and Its Difference with Design Temperature
    Hou, Chunyao
    Chai, Dong
    Cheng, Heng
    Ning, Shaoqing
    Yang, Bo
    Zhou, Yi
    WATER, 2022, 14 (24)
  • [25] Reinforcement effect analysis and global safety evaluation of Wugachong arch dam and its abutment
    Cheng H.
    Fu Z.-H.
    Zhang G.-X.
    Yang B.
    Jiang C.-F.
    Yantu Lixue/Rock and Soil Mechanics, 2017, 38 : 374 - 380
  • [26] Variable-intercept panel model for deformation zoning of a super-high arch dam
    Shi, Zhongwen
    Gu, Chongshi
    Qin, Dong
    SPRINGERPLUS, 2016, 5
  • [27] Analysis of interaction of overall stability of Wudongde super-high arch dam and underground powerhouse
    Lin, Peng
    Wang, Cheng
    Weng, Yonghong
    Cao, Quxiu
    Hu, Qingyi
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (11): : 2236 - 2246
  • [28] Study on Method for Controlling Opening and Closing Mechanism of Transverse Joint of Super-high Arch Dam
    Liu Youzhi
    Zhang Guoxin
    Fan Qixiang
    Chen Wenfu
    Li Jintao
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [29] A monitoring model for the stress on a super-high arch dam during pre-impoundment construction
    Niu, Jingtai
    Luo, Xiang
    Deng, Zhiping
    Zhang, Yang
    Guo, Yingjia
    Wang, Zhiqiang
    WATER SUPPLY, 2020, 20 (08) : 3604 - 3614
  • [30] Theory and application of monitoring information management and safety assessment for super-high concrete-faced rockfill dam
    School of Civil Engineering, Tianjin University, Tianjin 300072, China
    不详
    Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban), 2008, 9 (1083-1086):