共 50 条
- [21] Study on Mechanism of Crack on Upstream Surface of Super-high Arch Dam CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1325 - +
- [22] Engineering Advice for Preventing Crack on the Upstream Surface of Super-high Arch Dam CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1320 - +
- [23] Optimization study on super-high arch dam temperature control standard and measure 2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
- [25] Reinforcement effect analysis and global safety evaluation of Wugachong arch dam and its abutment Yantu Lixue/Rock and Soil Mechanics, 2017, 38 : 374 - 380
- [26] Variable-intercept panel model for deformation zoning of a super-high arch dam SPRINGERPLUS, 2016, 5
- [27] Analysis of interaction of overall stability of Wudongde super-high arch dam and underground powerhouse Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (11): : 2236 - 2246
- [28] Study on Method for Controlling Opening and Closing Mechanism of Transverse Joint of Super-high Arch Dam 2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
- [30] Theory and application of monitoring information management and safety assessment for super-high concrete-faced rockfill dam Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban), 2008, 9 (1083-1086):