共 50 条
- [41] Task Scheduling of Collaborative Product Design Project COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING, 2010, 6240 : 294 - 299
- [42] Dynamic Resource Scheduling in Disruption-Prone Software Development Environments FUNDAMENTAL APPROACHES TO SOFTWARE ENGINEERING, PROCEEDINGS, 2010, 6013 : 107 - +
- [43] Specification of a collaborative framework for equipment suppliers' integration in product development process CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 1347 - 1352
- [46] Process model supporting inter-enterprise collaborative product development Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2002, 8 (05): : 351 - 355
- [48] Task Scheduling of Product Development Process Based on Complex Features of Web ADVANCED MANUFACTURING SYSTEMS, PTS 1-3, 2011, 201-203 : 1003 - 1007
- [49] Distributive and cooperative scheduling considering multi-attribute product-mix, feedback process, and the dynamic utility control in resource sharing ISSM 2006 CONFERENCE PROCEEDINGS- 13TH INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, 2006, : 249 - +