Disaster recovery planning and business continuity for informaticians

被引:3
|
作者
Cervone H.F. [1 ]
机构
[1] School of Public Health, University of Illinois at Chicago, Chicago, IL
来源
Cervone, H. Frank (fcervone@uic.edu) | 1600年 / Emerald Group Holdings Ltd.卷 / 33期
关键词
BCP and BIRA; Business continuity planning; Business impact and risk analysis for informatics; Disaster recovery planning; DRP; Informatics project planning; Risk prioritization in informatics projects;
D O I
10.1108/DLP-02-2017-0007
中图分类号
学科分类号
摘要
Purpose: The purpose of this paper is to address the problems associated with informatics and analytics projects that are developed in an “organic” manner. As such, this often circumvents formal project management principles and practices. The decision to do this is determined by organizational factors; however, even in an informal environment, ensuring that adequate disaster recovery and business continuity plans are in place for all mission-critical applications is vital to ensure the long-term survival prospects of an organization in the event of a disaster. Design/methodology/approach: By adapting the principles and techniques of traditional disaster recovery and business continuity planning, an informatician can develop plans that integrate the requirements of their projects into a larger, organization-wide plan to recover from incidents and ensure continuity of business operations. Findings: The use of disaster recovery planning and business continuity planning can help ensure the long-term viability of informatics and analytics projects within an organization. Originality/value: Most business continuity planning is focused on projects that are formally developed and relatively large in scale. This paper applies these principles and practices to informatics and analytics projects that are developed informally and managed casually. Thorough an example, the point that more traditional disaster recovery and continuity practices can and should be applied in this less-formal environment is demonstrated. © 2017, © Emerald Publishing Limited.
引用
收藏
页码:78 / 81
页数:3
相关论文
共 50 条
  • [31] DISASTER RECOVERY PLANNING
    SUSOEFF, Y
    INFORMATION AGE, 1988, 10 (01): : 39 - 40
  • [32] Disaster recovery and business continuity after the 2010 flood in Pakistan: Case of small businesses
    Asgary, Ali
    Anjum, Muhammad Imtiaz
    Azimi, Nooreddin
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2012, 2 : 46 - 56
  • [33] World Marrow Donor Association Crisis Response, Business Continuity, and Disaster Recovery Guidelines
    Pingel, Julia
    Case, Cullen, Jr.
    Amer, Beth
    Hornung, Raymond A., III
    Schmidt, Alexander H.
    BIOLOGY OF BLOOD AND MARROW TRANSPLANTATION, 2012, 18 (12) : 1785 - 1789
  • [34] Disaster Recovery Planning
    Vuong, Jimmy
    PROCEEDINGS OF THE 2015 INFORMATION SECURITY CURRICULUM DEVELOPMENT CONFERENCE, 2015,
  • [35] PLANNING FOR DISASTER RECOVERY
    CURRY, JP
    INFOSYSTEMS, 1978, 25 (03): : 64 - &
  • [36] Business continuity planning methodology
    Lindstrom, John
    Samuelsson, Soren
    Hagerfors, Ann
    DISASTER PREVENTION AND MANAGEMENT, 2010, 19 (02) : 243 - 255
  • [37] Personal Business Continuity Planning
    Kadam, Avinash
    INFORMATION SECURITY JOURNAL, 2010, 19 (01): : 4 - 10
  • [38] Business continuity and availability planning
    Bennett, John
    Infosecurity, 2007, 4 (03)
  • [39] Business Continuity & Recovery Strategies
    Galloway, Merrilee
    Dyment, Mark
    GENETIC ENGINEERING & BIOTECHNOLOGY NEWS, 2009, 29 (05): : 58 - 58
  • [40] From Hot Ashes to a Cool Recovery: Reducing Risk by Acting on Business Continuity and Disaster Recovery Lessons Learned
    Blanke, Sandra J.
    McGrady, Elizabeth
    HOME HEALTH CARE MANAGEMENT AND PRACTICE, 2012, 24 (02): : 73 - 80