A construction method by divided double array structures

被引:0
|
作者
Fuketa, Masao [1 ]
Kanda, Shunsuke [1 ]
机构
[1] Department of Information Science and Intelligent Systems, Tokushima University, Minamijosanjima 2-1, Tokushima,770-8506, Japan
关键词
Compendex;
D O I
10.1504/IJISTA.2015.074336
中图分类号
学科分类号
摘要
Structure (composition)
引用
收藏
页码:273 / 283
相关论文
共 50 条
  • [41] The Construction of Citizenship in Divided Societies: A Conceptual Framework
    Reyhan, Cenk
    AMME IDARESI DERGISI, 2012, 45 (02): : 149 - 171
  • [42] Method for assigning double-stranded RNA structures
    Brown, TS
    Bevilacqua, PC
    BIOTECHNIQUES, 2005, 38 (03) : 368 - +
  • [43] Construction Method of Double-Carbon Domain Knowledge Graph
    Dong, Zhen
    Cheng, Fan
    Du, Fengqing
    Liu, Jing
    Bi, Zhongqin
    2022 HUMAN-CENTERED COGNITIVE SYSTEMS, HCCS, 2022, : 98 - 104
  • [44] CELLS WITH DOUBLE MINUTES DIVIDED INTO 2 CATEGORIES
    BULLERDIEK, J
    BARTNITZKE, S
    SCHLOOT, W
    CANCER GENETICS AND CYTOGENETICS, 1983, 9 (03) : 301 - 304
  • [45] Double Polarisation Russia's Divided Society
    Lipman, Maria
    OSTEUROPA, 2012, 62 (6-8): : 9 - +
  • [46] Double staining method for array tomography using scanning electron microscopy
    Kim E.
    Lee J.
    Noh S.
    Kwon O.
    Mun J.Y.
    Applied Microscopy, 2020, 50 (01)
  • [47] A Method for Flat-pack Origami Construction of Spatial Structures
    Ishida, Yasushi
    Lewis, Trevor Stephen
    Kane, Kevin
    Gupta, Ravi
    Heang, Alex
    IASS 60TH ANNIVERSARY SYMPOSIUM (IASS SYMPOSIUM 2019) - 9TH INTERNATIONAL CONFERENCE ON TEXTILE COMPOSITES AND INFLATABLE STRUCTURES (STRUCTURAL MEMBRANES 2019), 2019, : 447 - 458
  • [48] Bricks and Mortar: A Method for Identifying Construction Phases in Multistage Structures
    Pamela A. Smith
    Richard M. Smith
    Historical Archaeology, 2009, 43 (2) : 41 - 61
  • [49] Reliability analysis method of reinforced concrete structures during construction
    Ba, Songtao
    Gong, Jinxin
    Tong, Xiaoli
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2000, 40 (04): : 479 - 482
  • [50] The construction of temporary structures by CSG method in Tokuyama Dam project
    Oie, M
    Yamaguchi, Y
    Fujita, K
    Jikan, S
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 499 - 509