The Semmering Base Tunnel – Special challenges in construction

被引:1
|
作者
Der Semmering Basistunnel – Besondere Herausforderungen beim Bau
机构
[1] Gobiet, Gerhard
[2] Nipitsch, Gernot
[3] Wagner, Oliver K.
来源
| 1600年 / Ernst und Sohn卷 / 10期
关键词
Caverns - framework plan - Geotechnical - Railway tunnels - update of framework plan;
D O I
10.1002/geot.201700008
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Special Issue on Grand Challenges in Construction Materials
    不详
    CEMENT & CONCRETE COMPOSITES, 2019, 101 : 1 - 1
  • [42] Injection measures at the Brenner Base Tunnel – Challenges for human and equipment
    Voringer, Jürgen
    Hofmann, Matthias
    Knapp, Michael
    Leitner, Stefan
    Morianz, Markus
    Stadler, Philip
    Geomechanik und Tunnelbau, 2024, 17 (06): : 605 - 612
  • [43] Convergences and core extrusions during construction of the Gotthard Base Tunnel
    Cantieni, L.
    Anagnostou, G.
    Hug, R.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1639 - 1644
  • [44] Gotthard Base Tunnel: Work progress at the five construction sections
    Rehbock-Sander, M.
    Gerdes, A.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1223 - 1228
  • [45] Construction of a cavern under an autobahn embankment for the Ceneri Base Tunnel
    Filippini, Raffaele
    Kovári, Kalman
    Rossi, Francesco
    Geomechanik und Tunnelbau, 2012, 5 (02): : 175 - 185
  • [46] The benefits of InSAR monitoring during the construction of the Ceneri Base Tunnel
    Stocker, D.
    Merlini, D.
    Falanesca, M.
    Del Col, A.
    Gervasi, C.
    Iannicella, I.
    PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2544 - 2551
  • [47] Overcoming Design and Construction Challenges in a Former Military Base
    Wegley, Michael
    Marshall, Jonathon P.
    PIPELINES 2019: PLANNING AND DESIGN, 2019, : 142 - 151
  • [48] THE OPENING OF A TUNNEL AND OTHER CONSTRUCTION CHALLENGES OF GASDUC-3
    d'Oliveira, Celso A.
    Matos, Marcos S.
    Teixeira, Andre N.
    Coelho, Jorge F. P.
    Rodrigues, Fabiano C.
    Montes, Paulo Marcelo F.
    PROCEEDINGS OF THE ASME INTERNATIONAL PIPELINE CONFERENCE 2010, VOL 2, 2010, : 29 - 40
  • [49] Brenner Base Tunnel - Construction of the Exploratory Tunnel Non-linear Stochastic Structural Analysis
    Bergmeister, Konrad
    BETON- UND STAHLBETONBAU, 2008, 103 (10) : 658 - 665
  • [50] Technical visit to the Modane/Avrieux construction site (Moncenis base tunnel)
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2023, (148):