- [2] Construction of a sprayed permanent inner lining in caverns of the Semmering Base Tunnel Geomechanik und Tunnelbau, 2024, 17 (06): : 633 - 642
- [3] Semmering Base Tunnel – Design and construction of the shaft head caverns under difficult conditions 2018, Ernst und Sohn (11): : 462 - 470
- [5] The new semmering base tunnel project - An interdisciplinary challenge Geomechanik und Tunnelbau, 2010, 3 (02): : 110 - 118
- [6] Logistics of deep tunnel construction sites without portal access – SBT2.1 Semmering Base Tunnel Geomechanik und Tunnelbau, 2021, 14 (03): : 258 - 269
- [7] Highly specialized geophysical methods for undergroud construction works – Semmering Base Tunnel, a practice report Radinger, Alexander (alexander.radinger@geodata.com), 2021, Ernst und Sohn (14): : 654 - 660
- [10] Drilling and Grouting Works for Pressurised Groundwater Conditions of the Semmering Base Tunnel Geotechnical and Geological Engineering, 2022, 40 : 4377 - 4391