共 50 条
- [31] Technical and Economic Analysis of 150MW Turbine Unit about Two Reconstruction Modes for High Back Pressure Heating ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4, 2013, 291-294 : 1708 - +
- [33] The Thermal Economic Evaluation for Sliding Pressure Operation in 330MW Steam Turbine 2009 INTERNATIONAL CONFERENCE ON SUSTAINABLE POWER GENERATION AND SUPPLY, VOLS 1-4, 2009, : 2298 - 2304
- [34] RELATIONSHIP BETWEEN THE HIGH CONSTANT PLASMA POTENTIAL AND THE CONDITIONS IN AN INTERMEDIATE-PRESSURE rf CAPACITIVE DISCHARGE. Soviet physics. Technical physics, 1981, 26 (06): : 678 - 683
- [36] Analysis on thermal characteristics of high back pressure heating retrofit for large-scale steam turbine units 2020 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2020, 585
- [38] Applicability Analysis of High Back-pressure Heating Retrofit for Large-scale Steam Turbine Unit Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2017, 37 (11): : 3216 - 3222
- [40] STEAM FLOW AND HEAT TRANSFER IN THE INTERMEDIATE PRESSURE CYLINDER OF THE ULTRA-SUPERCRITICAL STEAM TURBINE PROCEEDINGS OF THE ASME TURBO EXPO: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, 2018, VOL 8, 2018,