Refurbishment of old railway tunnels using the Tauern Tunnel as an example

被引:0
|
作者
Moritz, Bernd [1 ]
Themessl, Florian [2 ]
Höhndorf, Markus [3 ]
Helmberger, Albert [4 ]
机构
[1] ÖBB-Infrastruktur AG, Streckenmanagement und Anlagenentwicklung, Europaplatz 12, Graz,8020, Austria
[2] ÖBB-Infrastruktur AG, Streckenmanagement und Anlagenentwicklung, Bahnhofsplatz 1, Villach,9500, Austria
[3] ÖBB-Infrastruktur AG, GB Projekte Neu-/Ausbau, Walther v. d. Vogelweideplatz 1/I, Klagenfurt,9020, Austria
[4] IL-Ingenieurbüro Laabmayr & Partner ZT GesmbH, Preishartlweg 4, Salzburg,5020, Austria
来源
Geomechanik und Tunnelbau | 2024年 / 17卷 / 05期
关键词
D O I
10.1002/geot.202400044
中图分类号
学科分类号
摘要
引用
收藏
页码:482 / 494
相关论文
共 50 条
  • [21] Crossing of an underground tunnel bored in clayey sand under an old railway tunnel in Madrid
    Melis, M
    Trabada, J
    Oteo, C
    Sola, P
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 1041 - 1046
  • [22] Olmata Tunnel, from survey to construction: an integrated design approach for the renewal of railway tunnels
    Foria, Federico
    Pacilli, Alessandro
    Collura, Salvatore
    Giordano, Riccardo
    Miceli, Gabriele
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2019, (131): : 31 - 45
  • [23] Non-ballasted track in railway tunnels - A cost-effective solution case study - Pannerdensch Kanaal railway tunnel
    van Seters, AJ
    Smits, MTJH
    Heijmans, RWGM
    Jansen, JAG
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 1873 - 1878
  • [24] Using innovative maintenance to extend lifetime of railway bridges and tunnels
    Wuorenjuuri, J.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 258 - 258
  • [25] Stereoscopic depth magnitudes at greater distances in an old steam railway tunnel
    Gillam, B.
    Palmisano, S.
    Govan, D.
    Allison, R.
    Harris, J. M.
    PERCEPTION, 2009, 38 : 59 - 60
  • [26] Application of key technologies in invert construction of heavy haul railway tunnel-taking Zhongtiaoshan tunnel as an example
    Zhang, Xianwei
    Hong, Kairong
    Chen, Hong
    Chang, Xiang
    Journal of Railway Science and Engineering, 2021, 18 (01) : 184 - 191
  • [27] Impact of dust loads in long railway tunnels: In-situ measurements and consequences for tunnel facilities and operation
    Sturm, Peter
    Fruhwirt, Daniel
    Steiner, Helmut
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 122
  • [28] Micro-vibration Blasting Technology for Railway Tunnels beneath Existing Metro Tunnel in Short Distance
    Fu, Hongxian
    Zhao, Jigang
    Gao, Yufan
    Journal of Railway Engineering Society, 2019, 36 (09) : 72 - 78
  • [29] Research on environmental geological problems caused by water and mud inrush in tunnels and long-term drainage: taking Chaoyang Tunnel of Guinan High-Speed Railway as an example
    Dai, Jianling
    Wei, Zhengxiong
    Pan, Zongyuan
    Yin, Renchao
    Wu, Yuanbin
    Guan, Zhende
    CARBONATES AND EVAPORITES, 2024, 39 (04)
  • [30] Influence of Sichuan-Tibet Railway Tunnel Length on Pressure Wave of EMU Train Passing through Tunnels
    Zhang L.
    Tian H.
    Du J.
    Jiao J.
    Wang Y.
    Mei Y.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2022, 58 (16): : 309 - 318