Options-based negotiation management of PPP–BOT infrastructure projects

被引:20
|
作者
Attarzadeh M. [1 ,2 ]
Chua D.K.H. [1 ]
Beer M. [3 ,4 ,5 ]
Abbott E.L.S. [1 ]
机构
[1] Department of Civil and Environmental Engineering, National University of Singapore (NUS), Singapore
[2] School of Civil and Environmental Engineering, Nanyang Technological University (NTU), Singapore
[3] Institute for Risk and Reliability, Leibniz Universität Hannover
[4] Institute for Risk and Uncertainty, University of Liverpool, Liverpool
[5] International Joint Research Center for Engineering Reliability and Stochastic Mechanics (ERSM), Tongji University, Shanghai
关键词
build–operate–transfer; negotiation; private finance; public–private partnerships; Real options;
D O I
10.1080/01446193.2017.1325962
中图分类号
学科分类号
摘要
The success of public–private partnership (PPP)–build–operate–transfer (BOT) projects largely depends on effectively mitigating the impact of a variety of risks and uncertainties, especially those influencing the revenue over time. Revenue instability is one of the main obstacles of PPP form of procurement. Government support, which is established as a clause in the concession agreement, should be carefully designed and well formulated. Options which arise from certain clauses in the contract are more valuable for risky projects. The purpose of this paper’s proposed model is to evaluate early fund generation options and also to calculate equitable bounds for a guaranteed revenue for the project sponsor under uncertainty and risk. The model is specially designed to alleviate the concern of revenue risk. To illustrate its applicability the methodology is then applied to a freeway PPP project and a power plant PPP project in Iran. The results show that the value of these options can indeed be significant and by applying the proposed systematic negotiation mechanism both public and private sectors can take advantage of its flexibility at the negotiation table. The proposed mechanisms can facilitate negotiations on the verge of a break down as well as accelerating ongoing negotiations that have become moribund. © 2017 Informa UK Limited, trading as Taylor & Francis Group.
引用
收藏
页码:676 / 692
页数:16
相关论文
共 50 条
  • [41] An options-based approach to analyze auction guarantees in the art market
    Charlin, Ventura
    Cifuentes, Arturo
    NORTH AMERICAN JOURNAL OF ECONOMICS AND FINANCE, 2020, 51
  • [42] Options-based Sequential Auctions for Dynamic Cloud Resource Allocation
    Hosseinalipour, Seyyedali
    Dai, Huaiyu
    2017 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2017,
  • [43] Options-based benchmark indicesA review of performance and (in)appropriate measures
    Natter, Markus
    JOURNAL OF FUTURES MARKETS, 2018, 38 (02) : 271 - 288
  • [44] Variation Negotiation in PPP Toll-Road Projects: Option Approach
    Nguyen, Tuan Anh
    Sun, Yuting
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (04)
  • [45] Options-based multi-objective evaluation of product platforms
    Gonzalez-Zugasti, Javier P.
    Otto, Kevin N.
    Whitcomb, Clifford A.
    NAVAL ENGINEERS JOURNAL, 2007, 119 (03) : 89 - 106
  • [46] An options-based method to solve the composability problem in sequential auctions
    Juda, AI
    Parkes, DC
    AGENT-MEDIATED ELECTRONIC COMMERCE VI: THEORIES FOR AND ENGINEERING OF DISTRIBUTED MECHANISMS AND SYSTEMS, 2005, 3435 : 44 - 58
  • [47] Attitude-Based Strategic Negotiation for Conflict Management in Construction Projects
    Yousefi, Saied
    Hipel, Keith W.
    Hegazy, Tarek
    PROJECT MANAGEMENT JOURNAL, 2010, 41 (04) : 99 - 107
  • [48] Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects
    Huang, Yu-Lin
    Chou, Shih-Pei
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (04) : 379 - 389
  • [49] Valuation of Infrastructure Projects: Review of the Real Options Literature
    Marques, Naielly Lopes
    Sanchez, Liliana Dennis Mejia
    Brandao, Luiz Eduardo Teixeira
    Bastian-Pinto, Carlos de Lamare
    TRANSPORTATION RESEARCH RECORD, 2024, 2678 (05) : 174 - 183
  • [50] PPP projects: improvements in stakeholder management
    Amadi, Chika
    Carrillo, Pat
    Tuuli, Martin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (02) : 544 - 560