共 50 条
- [41] Calibration system for the Central Fiber Tracker for the DO upgrade SCIFI 97: CONFERENCE ON SCINTILLATING FIBER DETECTORS, 1998, 450 : 393 - 402
- [45] The Upgrade of Fast Ferrite Tuning Matching System for ICRF in EAST Journal of Fusion Energy, 2015, 34 : 1067 - 1070
- [48] Framework Upgrade of The Detector Control System for JUNO 2016 IEEE-NPSS REAL TIME CONFERENCE (RT), 2016,
- [49] THE STATUS OF THE LAMPF CONTROL-SYSTEM UPGRADE NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1986, 247 (01): : 122 - 125
- [50] Network upgrade for the SLC: Control system modifications Proc IEEE Part Accel Conf, (2476-2478):