Research on game scheduling of galvanizing pipe production

被引:0
|
作者
Li Y. [1 ]
Dong S. [1 ]
机构
[1] School of Mechanical Engineering, University of Science and Technology Beijing, Beijing
来源
Functional Materials | 2017年 / 24卷 / 03期
关键词
Cooperative Game Theory; Galvanizing Pipe Production; Genetic algorithm;
D O I
10.15407/fm24.03.490
中图分类号
学科分类号
摘要
In this paper, we analyze and integrate the production process of "hot-dip galvanized steel pipe", the main product in the case enterprise and builds a model for the production scheduling with Cooperative Game Theory from the perspective of the enterprise. In order to get the Optimal Game Scheduling Solution, Genetic algorithm is used and Shaply value thought and β rule allocation method are combined to solve the problem of increased profit allocation in different customers. And fair and reasonable allocation mechanism is of great significance to the stability of the coalition and enterprise development. © 2017-STC "Institute for Single Crystals".
引用
收藏
页码:490 / 495
页数:5
相关论文
共 50 条
  • [21] Research on the Production Scheduling Optimization for Virtual Enterprises
    Huang, Min
    Huang, Ruixian
    Sun, Bo
    Li, Linrong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [22] Research on Temperature Control Algorithm in Pipe Production Process
    Chen, Wanzhi
    International Conference on Intelligent Computation Technology and Automation, Vol 1, Proceedings, 2008, : 437 - 440
  • [23] The Master Production Scheduling Model for Buyer and Vendor Based on Bargaining Game
    Zhu, Bao Lin
    Ji, Shou Feng
    ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 3073 - 3077
  • [24] ADDRESSING THE GAP IN SCHEDULING RESEARCH - A REVIEW OF OPTIMIZATION AND HEURISTIC METHODS IN PRODUCTION SCHEDULING
    MACCARTHY, BL
    LIU, JY
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (01) : 59 - 79
  • [25] Research on Production Scheduling Method and the Application in Switch Machine Production Enterprise
    Chen, Jianqing
    DIGITAL MANUFACTURING & AUTOMATION III, PTS 1 AND 2, 2012, 190-191 : 156 - 159
  • [26] Thermal-Sprayed Coatings on Bushing and Sleeve-Pipe Surfaces in Continuous Galvanizing Sinking Roller Production Line Applications
    Zhang, Guangwei
    Li, Deyuan
    Zhang, Ning
    Zhang, Nannan
    Duan, Sihua
    COATINGS, 2017, 7 (08):
  • [27] Research on Production of the Welded Pipe and Virtual Design and Manufacturing of Roll
    Yang, Xian
    Liu, Ruitao
    Zhang, Xiaona
    2009 SECOND INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING: KAM 2009, VOL 3, 2009, : 167 - +
  • [28] Research on collaborative production planning and scheduling of dynamic alliance
    Zhang Meihua
    Li Aiping
    Xu Liyun
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2007, : 1862 - 1867
  • [29] Research agenda on the formation and scheduling of SERU production system
    Yu Y.
    Li X.
    Cui S.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2021, 41 (02): : 465 - 474
  • [30] OPERATIONAL-RESEARCH IN SCHEDULING OF FERTILIZER PRODUCTION AT COMINCO
    ROBERTS, JE
    OPERATIONS RESEARCH, 1964, 12 : B62 - &