Research on game scheduling of galvanizing pipe production

被引:0
|
作者
Li Y. [1 ]
Dong S. [1 ]
机构
[1] School of Mechanical Engineering, University of Science and Technology Beijing, Beijing
来源
Functional Materials | 2017年 / 24卷 / 03期
关键词
Cooperative Game Theory; Galvanizing Pipe Production; Genetic algorithm;
D O I
10.15407/fm24.03.490
中图分类号
学科分类号
摘要
In this paper, we analyze and integrate the production process of "hot-dip galvanized steel pipe", the main product in the case enterprise and builds a model for the production scheduling with Cooperative Game Theory from the perspective of the enterprise. In order to get the Optimal Game Scheduling Solution, Genetic algorithm is used and Shaply value thought and β rule allocation method are combined to solve the problem of increased profit allocation in different customers. And fair and reasonable allocation mechanism is of great significance to the stability of the coalition and enterprise development. © 2017-STC "Institute for Single Crystals".
引用
收藏
页码:490 / 495
页数:5
相关论文
共 50 条
  • [1] Galvanizing threaded pipe and fasteners
    不详
    MATERIALS PERFORMANCE, 2004, 43 (04) : 37 - 37
  • [2] Scheduling in a continuous galvanizing line
    Valls Verdejo, Vicente
    Perez Alarco, M. Angeles
    Lino Sorli, M. Pilar
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (01) : 280 - 296
  • [3] Model and scheduling of a continuous galvanizing line
    Gao, Cong
    Tang, Lixin
    Wang, Ying
    IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 1829 - 1834
  • [4] HOT PIPE GALVANIZING FOR THE PETROLEUM-INDUSTRY
    PROSKURKIN, EV
    MITNIKOV, IE
    NORVILLO, NY
    GIRICH, VP
    NEFTYANOE KHOZYAISTVO, 1987, (04): : 54 - 56
  • [5] RESEARCH IN GAME BIRD PRODUCTION
    WOODARD, A
    CALIFORNIA AGRICULTURE, 1978, 32 (04) : 16 - 16
  • [6] Production scheduling with subcontracting: the subcontractor’s pricing game
    Xiangtong Qi
    Journal of Scheduling, 2012, 15 : 773 - 781
  • [7] Production scheduling with subcontracting: the subcontractor's pricing game
    Qi, Xiangtong
    JOURNAL OF SCHEDULING, 2012, 15 (06) : 773 - 781
  • [8] INTEGRATED PRODUCTION SCHEDULING SYSTEM FOR SEAMLESS PIPE COLD MILL
    KATAGI, Y
    YASUDA, H
    SOTOJIMA, S
    MORIYAMA, H
    MANABE, T
    TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 25 (11) : B305 - B305
  • [9] INTEGRATED PRODUCTION SCHEDULING SYSTEM FOR SEAMLESS PIPE COLD MILL
    KATAGI, Y
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S307 - S307
  • [10] Scheduling a Galvanizing Line by Ant Colony Optimization
    Fernandez, Silvino
    Alvarez, Segundo
    Diaz, Diego
    Iglesias, Miguel
    Ena, Borja
    SWARM INTELLIGENCE, ANTS 2014, 2014, 8667 : 146 - 157