Thermoeconomic optimization of a 1000 MW coal-fired unit

被引:0
|
作者
Cheng, Wei-Liang [1 ]
Ji, Hui [2 ]
机构
[1] School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing,102206, China
[2] ChinaUrban Construction Design & Research Institute, Beijing,100120, China
关键词
Coal - Boilers - Steam power plants - Fossil fuel power plants - Coal fired power plant;
D O I
暂无
中图分类号
学科分类号
摘要
In order to decrease the operation cost in power plants, a 1000 MW coal-fired power plant is studied as the research objective, and an evaluation model about unit thermoeconomic cost is built based on the thermoeconomic theory. By using the Matlab calculation tool, the thermoeconomic optimization of the energy system about the plant is presented. The results show that it is necessary to update the correlated equipment to increase its exergetic efficiency in the design of the entry unit. Moreover, the exergetic efficiency of the boiler is close to the optimum value, as for the steam turbine, its efficiency can be increased with the technical improvement. © 2015, Science Press. All right reserved.
引用
收藏
页码:239 / 242
相关论文
共 50 条
  • [21] A numerical study on the pendant superheater of a 1000 MW coal-fired supercritical CO2 boiler
    Chen, Tang
    Su, Hong-liang
    Sun, Qiang
    APPLIED THERMAL ENGINEERING, 2021, 184
  • [22] REDUCTION OF BOILER FEED PUMP NOISE IN AN 800 MW COAL-FIRED GENERATING UNIT.
    Thompson, A.R.
    Hoover, R.M.
    1978,
  • [23] REDUCTION OF BOILER FEED PUMP NOISE IN AN 800 MW COAL-FIRED GENERATING-UNIT
    THOMPSON, AR
    HOOVER, RM
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1979, 98 (04): : 1153 - 1157
  • [24] Thermoeconomic analysis of a coal-fired power plant combined with district heating and cooling
    Ziher, Dejan
    Poredos, Alojz
    ECOS 2006: PROCEEDINGS OF THE 19TH INTERNATIONAL CONFERENCE ON EFFICIENCY, COST, OPTIMIZATION, SIMULATION AND ENVIRONMENTAL IMPACT OF ENERGY SYSTEMS, VOLS 1-3, 2006, : 1261 - +
  • [25] Continuous DeNOx Technology for Improved Flexibility and Reliability of 1000 MW Coal-Fired Power Plants: Engineering Design, Optimization, and Environmental Benefits
    Yan, Xinrong
    He, Jianle
    Guo, Dong
    Zhang, Yang
    Ke, Xiwei
    Xiao, Hongliang
    Zheng, Chenghang
    Gao, Xiang
    PROCESSES, 2024, 12 (01)
  • [26] Steam Pressure Control of 1000 MW Ultra-Supercritical Coal-Fired Power Unit Based on Multi-Model Predictive Control
    王国良
    丁宝苍
    阎威武
    JournalofShanghaiJiaotongUniversity(Science), 2019, 24 (01) : 86 - 93
  • [27] Research on the Performance of 1000MW Supercritical Carbon Dioxide Power Cycle Coal-fired Unit Under Off-design Conditions
    Chen J.
    Chen L.
    Zhou J.
    Zhu M.
    Liao H.
    Liu H.
    Xu K.
    Xiang J.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2023, 43 (17): : 6681 - 6687
  • [28] Simulation and optimization of coal-fired power plants
    Sanpasertparnich, Teerawat
    Aroonwilas, Adisorn
    GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01): : 3851 - 3858
  • [29] BRITAIN TO RETROFIT SCRUBBERS TO 6000 MW OF COAL-FIRED CAPACITY
    KYTE, W
    POWER ENGINEERING, 1990, 94 (01) : 39 - 40
  • [30] The Operation Optimization Test of Main Steam Pressure on Large Coal-fired Power Unit
    Kan Weiming
    Yang Zhiping
    Zheng Likun
    Hu Yue
    Fu ZhongGuang
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 2055 - +