共 50 条
- [41] Managing engineering change requirements during the product development process CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2018, 26 (02): : 171 - 186
- [43] An expert system for managing hydrocarbon risks GROUNDWATER IN THE URBAN ENVIRONMENT - VOL I: PROBLEMS, PROCESSES AND MANAGEMENT, 1997, : 371 - 376
- [44] READER COMPETENCE AS A FACTOR OF INFORMATION CONNECTIONS IN THE TEACHING PROCESS MANAGING SYSTEM SCIENCE AND EDUCATION, 2014, (07): : 47 - +
- [45] Managing the ZIMS Project: The process of building a new information system. AZA ANNUAL CONFERENCE PROCEEDINGS 2002, 2003, : 213 - 217
- [46] Characterizing and Managing System Risks with Selective Redundancy during Early Mission Formulation ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM 2016 PROCEEDINGS, 2016,
- [47] Process configuration approach to information system development PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 332 - 336
- [49] Stages of information system development in the process approach ICTE IN REGIONAL DEVELOPMENT 2015, 2015, 77 : 98 - 103